
MSK320R
Commissioning English
MSK320R · Date
30.01.2018 · Art.
No.
88942 · Mod.
status
42/18
26
Connection type
•
E1: open cable end, 6-wire
Signal
not inverted Color
+UB
brown
GND
black
A1
red
B1
orange
A2
blue
B2
violet
•
E1: open cable end, 10-wire
Signal
inverted Color
+UB
brown
GND
black
A1
red
B1
orange
A/1
yellow
B/1
green
A2
blue
B2
violet
A/2
white
B/2
gray
5 Commissioning
Following correct mounting and wiring you can put the measuring system
into operation by switching on operating voltage.
The measuring system is a component of an incremental measuring system
that must be referenced at a defined position (reference point) to make
absolute measurement possible.
Summary of Contents for MSK320R
Page 30: ...MSK320R 30...
Page 31: ...MSK320R 31...