background image

 

 

 

INSTALLATION INSTRUCTIONS

 

PowerForm Area & Flood 

 

PN:443560815050

 

Rev: C

 

SlipFitter (SF) 

 

Page 5 of 6

 

Signify Canada Ltd./Signify Canada Ltée.

 

281 Hillmount Road, 

 

Markham, ON, Canada L6C 2S3

 

Signify North America Corporation

 

200 Franklin Square Drive

 

Somerset N.J. 08873, USA 

 

© 2018 Signify Holding. All rights reserved. This document contains information relating to the product portfolio 
of  Signify  which  information  may  be  subject  to  change.  No  representation  or  warranty  as  to  the  accuracy  or 
completeness  of  the  information  included  herein  is  given  and  any  liability  for  any  action  in  reliance  thereon  is 
disclaimed.  The  information  presented  in  this  document  is  not  intended  as  any  commercial  offer  and  does  not 
form part of any quotation or contract. All trademarks are owned by Signify Holding or their respective owners.

 

www.gardcolighting.com

 

SF 

-

 SlipFitter Arm Mounted on HORIZONTAL Mast Arm requires a 

3/8

-

16” 

x 3

-

1/2 bolt thru 

 

 

Splice Area

 

SlipFitter Arm

 

Mast Arm (by others)

 

(2) #8

-

32 screws,

 

Splice Cover and Gasket.  

 

(4)  1/2

-

13” 

Allen 

 

Socket Head bolts

 

STEP 7: 

 

Holding routed wires in splice area, carefully slip luminaire onto 

the Mast Arm.  Check to insure that wires are not pinched be-

tween inside of SlipFitter Arm and the Mast Arm and that lumi-

naire lead wires rotate freely.  

 

 

STEP 8: 

 

Install the 3/8

-

16 x 

3

-

1/2” 

bolt thru the SlipFitter and Mast Arm, 

 

Install 3/8

-

16 Hex with Nylock nut to the end of the bolt and 

tighten the bolt to 20 ft.

-

lbs. Fig. 6.  Insure wires are not pinched 

by the bolt.

 

 

STEP 9: 

 

Level luminaire by adjusting engagement of 

(4) 1/2

-

13” 

Allen 

 

Socket Head bolts and re

tighten the bolts to 43 ft.

-

lbs. Fig. 7

 

 

 

 

Fig. 5

 

Luminaire

 

Fig. 6

 

3/8

-

16 x 

3

-

1/2” 

bolt

 

3/8

-

16”

Hex Nut 

with Nylock

 

Fig. 7

 

(4) 1/2

-

13 Allen 

Socket Head bolts

 

Summary of Contents for GARDCO PowerForm

Page 1: ...all damaged product Handling and installing damaged products can potentially increase the risks mentioned In case of damage and or missing parts upon arrival of the luminaire please contact SanMarcos...

Page 2: ...ve owners www gardcolighting com STEP 1 To access wire splice area remove 2 8 32 Splice cover screws splice cover and gasket STEP 2 Route the supply wires through the Tenon Secure the supply wire to k...

Page 3: ...Slip Fitter Arm Mounted on VERTICAL Tenon Cont d Note Tenon must be 4 00 or longer STEP 4 Using 3 8 Allen wrench hand tighten 4 Allen Socket Head bolts until tip of screws engage Tenon Do not fully ti...

Page 4: ...ility for the structural integrity of the Mast Arm The EPA value of the luminaire CANNOT exceed the maximum loading value of the Mast Arm SlipFitter Arm Mast Arm by others STEP 1 Slip the SlipFitter A...

Page 5: ...are owned by Signify Holding or their respective owners www gardcolighting com SF SlipFitter Arm Mounted on HORIZONTAL Mast Arm requires a 3 8 16 x 3 1 2 bolt thru Splice Area SlipFitter Arm Mast Arm...

Page 6: ...as any commercial offer and does not form part of any quotation or contract All trademarks are owned by Signify Holding or their respective owners www gardcolighting com SF SlipFitter Arm Mounted on H...

Page 7: ...produits endommag s peuvent potentiellement augmenter les risques mentionn s En cas de dom mage ou de pi ces manquantes sur r ception du luminaire veuillez communiquer avec SanMarcos TSC signify com o...

Page 8: ...ion enlevez 2 vis n 8 32 de couvercle de jonction le couvercle de jonction et le joint TAPE 2 Faites passer les fils d alimentation travers le tenon Fixez le fil d alimentation afin qu il ne glisse pa...

Page 9: ...voter jusqu la position de vis e horizontale appropri e Serrez les boulons jusqu environ 43 pieds livres TAPE 5 Effectuez la connexion des fils selon le Code national de l lectricit ou les codes locau...

Page 10: ...g n est pas responsable de l int grit structurelle du bras du m t La valeur EPA du luminaire NE PEUT PAS d passer la valeur maximale de chargement du bras du m t Ces calculs doivent tre v rifi s Bras...

Page 11: ...e raccord lisse MRL fix au bras HORIZONTAL du m t requiert un boulon de 3 8 16 x 3 1 2 travers le tuyau du bras du m t suite Zone de jonction Bras du montage raccord lisse Bras du m t par d autres tuy...

Page 12: ...tre consid r e comme une offre commerciale et ne fait pas partie d aucun devis ni contrat Toutes les marques de commerce appartiennent Signify Holding ou leur propri taire respectif www gardcolightin...

Reviews: