
July 2018
443580499131
Signify North America Corporation
200 Franklin Square Drive
Somerset, NJ 08873, USA
Phone: 855-486-2216
www.chloride-lighting.com
Signify Canada Ltd./Signify Canada Ltée.
281 Hillmount Road,
Markham, ON, Canada L6C 2S3
Phone: 800-668-9008
(Note: Grid ceiling installation requires Chloride p/n
FBHK bar hanger kit.) Remove one knockout in
sheetmetal housing for AC service entry. Two grid
ceiling adapters are provided – one for each side of the
main housing. They are attached to the main housing by
removing the four oblong knockouts in the short sides of
the main housing and using the four #8 nuts provided.
Place bar hangers though the lowest set of holes in the
adapters and attach to ceiling grid. Adjust the vertical
alignment so that the backbox flanges are flush with the
bottom (room side) of the ceiling tile.
Step 2 -
Connect red battery lead by pushing connector halves together (see above illustration). Refer to “AC
Hookup” table below for AC supply wiring guide.
AC Hookup
120VAC Operation
277VAC Operation
White Wire – Common
White Wire – Common
Black Wire – 120VAC Line
Black Wire – Cap Off
Blue Wire – Cap Off
Blue Wire – 277VAC Line
Green Wire - Ground
Green Wire - Ground
CAUTION:
Unused primary wire must be insulated to prevent shorting.