SIGNIFY CHLORIDE Fusion F1WIC Manual Download Page 3

 

 

July 2018 
443580499131 
 

Signify North America Corporation

 

200 Franklin Square Drive

 

Somerset, NJ  08873, USA

 

Phone:  855-486-2216

 

www.chloride-lighting.com

 

 

Signify Canada Ltd./Signify Canada Ltée. 
281 Hillmount Road,

 

Markham, ON, Canada  L6C 2S3

 

Phone:  800-668-9008

 

 

(Note: Grid ceiling installation requires Chloride p/n 
FBHK bar hanger kit.)  Remove one knockout in 
sheetmetal housing for AC service entry.  Two grid 
ceiling adapters are provided – one for each side of the 
main housing.  They are attached to the main housing by 
removing the four oblong knockouts in the short sides of 

the main housing and using the four #8 nuts provided.  
Place bar hangers though the lowest set of holes in the 
adapters and attach to ceiling grid. Adjust the vertical 
alignment so that the backbox flanges are flush with the 
bottom (room side) of the ceiling tile.

 

Step 2  - 

Connect red battery lead by pushing connector halves together (see above illustration).  Refer to “AC 
Hookup” table below for AC supply wiring guide. 
 

AC Hookup 

120VAC Operation 

277VAC Operation 

White Wire – Common 

White Wire – Common 

Black Wire – 120VAC Line 

Black Wire – Cap Off 

Blue Wire – Cap Off 

Blue Wire – 277VAC Line 

Green Wire - Ground 

Green Wire - Ground 

CAUTION:

 Unused primary wire must be insulated to prevent shorting. 

Summary of Contents for CHLORIDE Fusion F1WIC

Page 1: ...tended use Do not use outdoors Do not let supply cords touch hot surfaces Do not mount near gas or electric heaters Caution Halogen cycle lamp s are used in this equipment To avoid shattering Do not operate lamp in excess of rated voltage protect lamp against abrasion and scratches and against liquids when lamp is operating dispose of lamp with care Halogen cycle lamps operate at high temperatures...

Page 2: ...the outer surface of the stud before securing the backbox to the stud After sheetrock installation the leading edge of the backbox should be flush with the outer sheetrock surface room or finished surface Step 1 Sheetrock Ceiling Mount 14 1 4 x 9 1 8 cutout required Note This product is U L approved for use in IC rated ceiling constructions Remove one knockout in sheetmetal housing for AC service ...

Page 3: ...he four oblong knockouts in the short sides of the main housing and using the four 8 nuts provided Place bar hangers though the lowest set of holes in the adapters and attach to ceiling grid Adjust the vertical alignment so that the backbox flanges are flush with the bottom room side of the ceiling tile Step 2 Connect red battery lead by pushing connector halves together see above illustration Ref...

Page 4: ... Remove 4 pin lamp connector from main housing Push lamp sockets onto pins on MR 16 lamps Note The reflector lens system has been designed so that rotation of the system will not be required for most installations Reflectors and lenses may be rotated 90 if necessary Step 4 Connect flex cable connectors from circuit board assembly and cover together as shown The flex cable is keyed for proper align...

Page 5: ... this product operate at very high temperatures Care should be taken when servicing unit to avoid burns Note A This equipment is provided with a lockout feature whereby connecting battery leads prior to energizing AC power will not turn on the emergency lamps After AC power is energized the emergency lamps will turn on upon AC power failure B This equipment is provided with a low battery disconnec...

Page 6: ... diagnostic test Red LED indicator Single Flash battery fault Two Flashes lamp failure light bar failure EXIT signs Three Flashes charger fault Four Flashes transfer fault If more than one fault condition is present simultaneously the red LED will flash the indication pattern for each fault independently then repeat the cycle Pushbutton Test Switch Long Press longer than 0 5sec transfers product t...

Page 7: ...gnify North America Corporation 200 Franklin Square Drive Somerset NJ 08873 USA Phone 855 486 2216 www chloride lighting com Signify Canada Ltd Signify Canada Ltée 281 Hillmount Road Markham ON Canada L6C 2S3 Phone 800 668 9008 ...

Reviews: