2
#$%&(
@ A<B +
)(*
/ &(;('"?(
Step 1.
+ 8
Step 2.
: ; <<=>!?@:A
Step 3.
!#B&
Step 4.
* 8 ;)=A?GH:I
J8
Step 5.
? ; =&>(?A
J IGJ
Step 6.
* 8
;K ?
8 A
=)K
G"
chlorine"#J
8 * ??I L
chlorine calibration and set up procedure.
=)K
?GIGNJ N* ??I
O%G ?GI ??I
O G
*O$G
#
?8 N?PN
8 ?%@<
;H ( ?I =&A
Step 9.
?%@<
NN ;H
( ?I =&A
Step 10.
Verify the inlet and drain ball valves are in the open position
;( ?I
==> A
Step 11.
8 Q for
Q
Step 12.
I
;( ??I OLA
,% '
1. Chlorine panel assembly
a. Built-in pressure regulator 15 to 120 psi.
b. 3/8 inch hose barb connectors.
B = );%JB$%&A
a. 1 spare membrane cap
b. 1 bottle of electrolyte solution
=;A
d.
1
syringe
% = )G%JBLB#J&&;=OW&&=O#OA;%J#$%&J==IJB=IJ%=A
# + Q
a. English panel assembly manual
b. CD with multi-language manuals
!
d.
Drill
template
O = H X
6. Customer
supplied
%@<N
G
Sensor access plugs
$