RENATO RANGE HOOD INSTALLATION
REAR DISCHARGE
A 90-degree elbow may be installed immediately above the
hood.
CALCULATING VENT SYSTEM LENGTH
To calculate the length of the system you need, add the
equivalent feet (meters) for all vent pieces used in the
system.
3
Renato Range Hood Installation Instructions
VENTILATION REQUIREMENTS
(cont’d.)
Wood
Screws
INSTALLATION
TOOLS AND MATERIALS
Pencil
Level
Utility Knife
Drill
Tape Measure
Phillips
Screwdriver
Duct Tape
6” Ducting
Outside Duct
Cap
Jigsaw
Drill holes A (W)-B-C according to indications quoted
in (fig.1).
Use screws and screw anchors suitable for wall (e.g.
reinforced cement, plasterboard) for the mounting of
the range hood. Where screws and screw anchors are
supplied, ensure that they are suitable for the type
of wall where the range hood is to be mounted.
Affix the bracket Z to the wall via the drill holes C.
Hang the range hood on the wall using the hooks A
and bracket W.
Fasten the raange hood using the fastening drill holes
B.
Connect the flange Y to the outside duct cap using 6”
ducting. If the outside cap requires a 5” connection, a
reduction coupling may be used (Fig.5).
Thread the upper flue cover E to the inside of the
lower flue cover F. Hang the connected flue cover by
inserting vertically on the range hood. Unthread the
upper flue cover E towards the top, locking it in with
the appropriate screws in the drill holes G of the
bracket Z (fig. 7) whic was previously attached to the
wall.