VOLTAGE          

 

120/240 1Ø  

120/208 3Ø 

 

277/480 3Ø

TYPE

 

Natural Gas 

LP Vapor LPV)

ELEC. SERVICE

 

100 Amp      

 

200 Amp    

 

400 Amp

 

600 Amp      

 

Other________

Before installation contact local jurisdiction to confirm all
requirements are met. Jurisdictions may vary. Siemens
recommends contacting local authorities prior to installation.

Loads: Look for heavy building loads such as refrigeration, 
air conditioning, pumps or UPS systems.

Use the following for sizing and determining generator kW.

QT Upgrade Required

These applications require an upgrade from the QT Series:
NEC 695 Fire Pumps                  
NEC 700 Emergency Systems
NFPA 20 Fire Pumps                  
NFPA 99 Healthcare
NFPA 110 Emergency Systems

Reference Codes

Related Codes and Standards:
NEC 225 Branch Circuits and Feeders 
NEC 240 Overcurrent Protection
NEC 250 Grounding          
NEC 445 Generators
NEC 701 Legally Required Standby  
NEC 702 Optional Standby
NFPA 37 Installation and Use of Stationary Engines
NFPA 54 National Fuel Gas Code
NFPA 58 LP Gas Code 

Motor Load Table  (refer to Table 1)
Device

HP     RA     LRA     kW Running    Starting 

(= HP)

kW 

Table 6

Non-Motor Load Table  (refer to Table 2)
Device

Amps    

kW 

Table 7

Starting kW for HP < 7.5 starting kW = HP x 3
Starting kW for HP > 7.5 starting kW = HP x 2
Starting kW for loading with no listed HP, calculate HP based on running amps
in the chart on the right.

Recommended Generator Size ________  Refer to Generator Sizing Instructions on other side of this sheet.

INSTALL NOTES:

1.  Suggested concrete pad minimum thickness of 4" with 12" overhang on all  sides. Fiberglass pad included with air-cooled products.
2. Consult manual for installation recommendations.
3. Consult local authority having jurisdiction for local requirements.

To Calculate kW 

(refer to page 2 for shortcut)

120 V  1Ø

Amps x 120/1000 = kW

240 V  1Ø

Amps x 240/1000 = kW

208 V  3Ø

Amps x 208 x √3 x PF/1000 = kW

240 V  3Ø

Amps x 240 x √3 x PF/1000 = kW

480 V  3Ø

Amps x 480 x √3 x PF/1000 = kW

PF is application power factor (worst case 1.0)
Typical application power factor is 0.95.

Resources in Sizing Guide

Surge Capability Chart – References running amps of units and LRA
Propane Tank Sizing Chart – Measures fuel consumption of generator units
Motor Load Reference Guide – Reference guide for basic motor loads
Non-Motor Load Reference Guide – Reference guide for non-motor loads
Fuel Piping Sizing Chart – Assists in calculating adequate pipe size for
natural gas and propane
UPS – Generator Compatibility

UPS Information

1.5 x kVA rating for a filtered system
3 – 5 x kVA rating for an unfiltered system
Siemens recommends you refer to the Siemens UPS Generator
Compatibility sheet and notify the manufacturer of the UPS 
system to assist in your installation.

Transfer Switch Availability
SR6ST 

– 100 and 200 Amp service entrance rated

RTS 

– 100, 200, 400 Amp

SR6SI switch only works with R100 controller.

XT 6XR

– 100, 150, 200, 300, 400, 600, 800 Amp

HTS switch only works with H100 controller. Avail. in 
NEMA 1, NEMA 3R and NEMA 12. Refer to Siemens 
product catalog for the appropriate transfer switch.

8

Summary of Contents for Standby Generators

Page 1: ...Sizing Guide standby GENERATORS ...

Page 2: ...trical load consult the manufacturer s nameplate on each major appliance or piece of equipment to determine its starting and running requirements in terms of watts amps and voltage When choosing the generator output for commercial or industrial applications select a rating that is approximately 25 higher than the peak load for example if the load is about 40 kilowatts select a 50 kW genset A highe...

Page 3: ... 74 49 21 30 375 250 108 20 Ton 240 000 BTU 10 Hp x2 20 98 65 28 20 250 167 72 20 Ton 240 000 BTU 20 Hp 20 n a 65 28 40 500 333 144 25 Ton 300 000 BTU 25 25 n a 82 35 50 625 416 180 30 Ton 360 000 BTU 15 Hp x2 30 n a 98 42 30 375 250 108 30 Ton 360 000 BTU 30 Hp 30 n a 98 42 60 750 500 217 40 Ton 480 000 BTU 20 Hp x2 40 n a 131 57 40 500 333 144 40 Ton 480 000 BTU 40 Hp 40 n a 131 57 80 1000 666 2...

Page 4: ...heat per 1000 ft 2 12 n a 50 Heat pump elements per 1000 ft 2 7 n a 29 Dryer 5 5 n a 23 Hot tub 5 n a 21 Range oven 5 n a 21 Hot water 4 5 n a 19 Stove top per burner 1 5 n a 6 General receptacles per 1000 ft 2 1 8 3 n a Lighting per 1000 ft 2 0 75 6 3 n a Blow dryer 1 25 10 4 n a Dishwasher 1 5 12 5 n a Microwave 1 8 3 n a Toasters 1 8 3 n a 3 ...

Page 5: ...s Operating at 3600 RPM Rated Output Surge Capability Surge Capability Running Amps LR Amps at 15 Voltage Dip LR Amps at 30 Voltage Dip Size kW 240V 1ø 208V 3ø 480V 3ø 240V 1ø 208V 3ø 480V 3ø 240V 1ø 208V 3ø 480V 3ø 7 29 24 11 23 n a n a 46 n a n a 10 42 35 15 31 n a n a 63 n a n a 13 54 45 20 38 n a n a 75 n a n a 16 67 56 24 46 n a n a 92 n a n a 20 83 69 30 63 42 24 121 80 47 25 104 87 38 71 47...

Page 6: ...460 130 50 215 150 30 150 LP vapor LPV Pipe Size in kW 0 75 1 1 25 1 5 2 2 5 3 7 165 570 10 70 255 1000 13 45 170 690 16 30 130 540 20 15 80 340 745 25 50 235 520 35 20 125 290 1030 45 82 195 725 60 45 115 445 1095 70 20 60 260 660 80 15 50 230 590 100 30 165 430 1305 130 70 205 660 150 45 150 490 Note Table values are maximum pipe run in feet Pipe sizing is based on 5 H2O pressure drop Sizing inc...

Page 7: ... 500 300 119 37 46 40 792 540 20 528 360 0 264 180 850 510 165 41 50 40 1 217 700 20 811 800 0 405 900 1000 600 192 41 50 40 1 416 960 20 944 640 0 472 320 LP Vapor LPV Withdrawal Fuel Consumption Load kW BTU Hr Gal Hr 7 110 000 1 2 10 190 000 2 1 13 215 000 2 4 16 252 000 2 8 20 340 000 3 8 25 390 000 4 3 35 500 000 5 5 45 620 000 6 8 60 800 000 8 8 70 950 000 10 5 80 1 100 000 12 2 100 1 400 000...

Page 8: ...a minimum of 2 hertz Generator Sizing Recommendation Limit the total UPS loading to 15 20 of the generator capacity Double Conversion This technology is most common for critical load applications Double conversion UPS s constantly rectify AC to DC and then invert the DC back into AC This configuration results in an output that corrects for voltage and frequency deviations There are single and thre...

Page 9: ... with no listed HP calculate HP based on running amps in the chart on the right Recommended Generator Size ________ Refer to Generator Sizing Instructions on other side of this sheet INSTALL NOTES 1 Suggested concrete pad minimum thickness of 4 with 12 overhang on all sides Fiberglass pad included with air cooled products 2 Consult manual for installation recommendations 3 Consult local authority ...

Page 10: ...e Table 1 for typical motor sizes and electrical requirements 2 Enter all non motor loads expected to run during peak load levels into Table 7 Reference Table 2 for typical residential loads and rules of thumb 3 Sum the running motor load data but do not include the largest motor that is cycling Add to this value the non motor load data and the starting kW for the largest cycling motor Motor runni...

Page 11: ... with no listed HP calculate HP based on running amps in the chart on the right Recommended Generator Size ________ Refer to Generator Sizing Instructions on other side of this sheet INSTALL NOTES 1 Suggested concrete pad minimum thickness of 4 with 12 overhang on all sides Fiberglass pad included with air cooled products 2 Consult manual for installation recommendations 3 Consult local authority ...

Page 12: ... Table 1 for typical motor sizes and electrical requirements 2 Enter all non motor loads expected to run during peak load levels into Table 7 Reference Table 2 for typical residential loads and rules of thumb 3 Sum the running motor load data but do not include the largest motor that is cycling Add to this value the non motor load data and the starting kW for the largest cycling motor Motor runnin...

Page 13: ... with no listed HP calculate HP based on running amps in the chart on the right Recommended Generator Size ________ Refer to Generator Sizing Instructions on other side of this sheet INSTALL NOTES 1 Suggested concrete pad minimum thickness of 4 with 12 overhang on all sides Fiberglass pad included with air cooled products 2 Consult manual for installation recommendations 3 Consult local authority ...

Page 14: ... Table 1 for typical motor sizes and electrical requirements 2 Enter all non motor loads expected to run during peak load levels into Table 7 Reference Table 2 for typical residential loads and rules of thumb 3 Sum the running motor load data but do not include the largest motor that is cycling Add to this value the non motor load data and the starting kW for the largest cycling motor Motor runnin...

Page 15: ...Notes ...

Page 16: ...siemens com generators RPSA GENSZ 0506 New 3M0506B A Printed in USA 2006 Siemens Energy Automation Inc All Rights Reserved Siemens is a registered trademark of Siemens AG Product names mentioned may be trademarks or registered trademarks of their respective companies Specifications are subject to change without notice ...

Reviews: