5.4.2
Commissioning in gaseous environments
Usual arrangement
Special arrangement
①
Pressure transmitter
⑥
Shut-off valves
②
Stabilizing valve
⑦
Drain valves
③
,
④
Differential pressure valves
⑧
Condensate vessels (optional)
⑤
Differential pressure lines
⑨
Differential pressure transducer
Pressure transmitter above the differential pressure
transducer
Pressure transmitter below the
differential pressure transducer
Requirement
All shut-off valves are closed.
Procedure
To commission the pressure transmitter for gases, proceed as follows:
1.
Open both the shut-off valves
⑥
at the pressure tapping point.
2.
Open the stabilizing valve
②
.
3.
Open the differential pressure valve (
③
or
④
).
4.
Check and, if necessary, correct the zero point when the start-of-scale value is 0 kPa (4 mA).
5.
Close the stabilizing valve
②
.