72
PBD-51041066
SITRANS LG270 - Operating Instructions
44295-EN-140321
8. Enter new probe length and then carry out a fresh adjustment
(see "
Setup procedure, Carrying out min. adjustment - Carrying
out max. adjustment
").
1
1
1
2
2
3
A
B
C
45 mm (1.77")
100 mm (3.94")
25 mm (0.98")
50 mm (1.97")
Fig. 41: Shortening the cable probe
A Gravity weight - cable ø 4 mm
B Gravity weight - cable ø 2 mm
C Centering weight - cable ø 2 mm
1 Threaded pins
2 Thread M8 for eye-bolt
3 Fixing screw - centering weight
8.7
Software update
The following components are required to update the sensor soft-
ware:
•
Sensor
•
Voltage supply
•
HART modem
•
PC with PACTware
•
Current sensor software as file
You can find the actual sensor software as well as detailed infor
-
mation of the procedure in the download area on our homepage:
www.siemens.com/sitranslg.
You can find information about the installation in the download file.
Caution:
Instruments with approvals can be bound to certain software ver-
sions. Therefore make sure that the approval remains effective with a
software update.
You can find detailed information in the download area on our home
-
page: www.siemens.com/sitranslg.
8.8
How to proceed if a repair is needed
If it is necessary to repair the instrument, please contact Sie-
mens Milltronics Process Instruments. You find the locations on
"www.siemens.com/sitranslg".