Connecting
4.5 Cable preparation
PM230 Power Module IP55
46
Hardware Installation Manual, 11/2014, A5E35319202B AA
4.5
Cable preparation
Preparation information
The table and the diagram below are provided to ensure that the cables for use with the PM
power and motor terminals are prepared correctly.
No screening dimensions are given for the input power cables as these are not normally
screened cables.
Diagram
Cable type
Dimensions
A
B
C
D
FSA power cable 10 mm
0.39 inches
60 mm
2.36 inches
-
90 mm
3.54 inches
FSA motor cable
10 mm
0.39 inches
60 mm
2.36 inches
10 mm
0.39 inches
60 mm
2.36 inches
FSB power cable 10 mm
0.39 inches
60 mm
2.36 inches
-
50 mm
1.96 inches
FSB motor cable
10 mm
0.39 inches
50 mm
1.96 inches
10 mm
0.39 inches
40 mm
1.57 inches
FSC power cable 10 mm
0.39 inches
50 mm
1.96 inches
-
70 mm
2.75 inches
FSC motor cable
10 mm
0.39 inches
50 mm
1.96 inches
10 mm
0.39 inches
40 mm
1.57 inches