3.1.5

Cable markings

Fundamentals
A visual inspection is made to see whether cables and conductors are marked as defined in the 

circuit diagram.

Test procedure

1. The customer selects cables or conductors by random sampling.

– Are the cable end tags and conductor colors of cables and conductors marked as defined 

in the circuit diagram?

Result

The test is passed if the cable and conductor markings match what is specified in the circuit 

diagram.

3.1.6

Setting values of circuit breakers, if used

Fundamentals
The circuit breaker settings are visually checked against what is specified in the circuit diagram.

Test procedure

1. The customer selects circuit breakers by random sampling.
2. The circuit breaker settings are visually checked against what is specified in the circuit 

diagram.

Result

The test is passed if the circuit breaker settings match what is specified in the circuit diagram.

3.1.7

Dimensions

Fundamentals
The drive dimensions are measured. The basis for the visual inspection is the order-specific 

dimension drawing.

Test procedure

1. The external dimensions, length, width and height of the drive are measured.

Tests
3.1 Visual inspection

SINAMICS DCM 6RN  F03

18

Reference Manual Rev.201902141527  SINAMICS DCM

Summary of Contents for SINAMICS DCM 6RN

Page 1: ...www siemens com drives Excitation Unit SINAMICS DCM Type 6RN Reference Manual Edition 02 2019 Tests carried out on drives This documentation pertains to SINAMICS DCM F03 ...

Page 2: ...14 02 2019 15 27 V8 00 ...

Page 3: ...Excitation Unit SINAMICS DCM Type 6RN Reference Manual This documentation pertains to SINAMICS DCM F03 Edition 02 2019 Introduction 1 General scope of services 2 Tests 3 ...

Page 4: ...ose who based on their training and experience are capable of identifying risks and avoiding potential hazards when working with these products systems Proper use of Siemens products Note the following WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation If products and components from other manufacturers are used these...

Page 5: ...1 3 Electrical cabinet components 17 3 1 4 Cable installation 17 3 1 5 Cable markings 18 3 1 6 Setting values of circuit breakers if used 18 3 1 7 Dimensions 18 3 2 Function test 20 3 2 1 Connecting the excitation equipment 20 3 2 2 Voltage test 20 3 2 3 Current limitation test 21 3 2 4 External EMERGENCY OFF 21 3 2 5 Temperature monitoring of the de excitation resistor 22 Index 23 SINAMICS DCM 6R...

Page 6: ...Table of contents SINAMICS DCM 6RN F03 6 Reference Manual Rev 201902141527 SINAMICS DCM ...

Page 7: ...ble testing process and maximum possible customer satisfaction The following drive tests are described Routine tests Tests that are offered as standard Note If the scope of testing and inspection cannot fulfill all customer requirements please consult your Siemens sales advisor at head office SINAMICS DCM 6RN F03 Reference Manual Rev 201902141527 SINAMICS DCM 7 ...

Page 8: ...Introduction SINAMICS DCM 6RN F03 8 Reference Manual Rev 201902141527 SINAMICS DCM ...

Page 9: ...tail in advance Due to the high capacity utilization of the associated equipment it might not be possible to carry out individual inspections and tests that are requested late if the planned test is already in progress If you have received specific requirements from your customer please send these as soon as possible with the necessary key data to the Nuremberg Vogelweiherstrasse factory Sequence ...

Page 10: ...test fields for drives are performed as part of the manufacturing process Note Limited number of persons in the test field For safety reasons the number of persons in the test field is limited In addition to the regional sales partner only two persons from the customer are permitted in the test field at the same time Note Test without load motors or multipulse infeeds via transformers in the test ...

Page 11: ...2 1 Routine test During production the drive is subject to an internal routine test General scope of services 2 1 Routine test SINAMICS DCM 6RN F03 Reference Manual Rev 201902141527 SINAMICS DCM 11 ...

Page 12: ...t step is documented in the acceptance report with the specific results of the step The visual inspection is part of the function test F72 F73 Visual inspection Order codes Without the customer present With the cus tomer present Rating plate Housing degree of protection Electrical cabinet components Cable installation Cable markings Setting values of circuit breakers if used Dimensions F03 See als...

Page 13: ...ts are performed and documented in the Siemens test field by internal test field personnel For the function test the drive is in the test mode with restricted monitoring functions The successful test is confirmed in a 3 1 certificate or in the case that the customer has ordered the acceptance test in a 3 2 certificate See also Function test Page 20 General scope of services 2 3 Function tests SINA...

Page 14: ... present With the cus tomer present High voltage test Measuring the insulation resistance F76 F77 The successful test is confirmed in a 3 1 certificate or in the case that the customer has ordered the acceptance test in a 3 2 certificate The insulation test is performed on a separate acceptance day prior to the function test General scope of services 2 4 Insulation test SINAMICS DCM 6RN F03 14 Ref...

Page 15: ...Tests 3 The tests that have been expressly ordered for the drive with serial number K91539032021001 are listed in the following SINAMICS DCM 6RN F03 Reference Manual Rev 201902141527 SINAMICS DCM 15 ...

Page 16: ...ure 1 The data on the rating plate and the routine test certificate are visually compared Result The test is passed if the data match up 3 1 2 Housing degree of protection Fundamentals A check is made as to whether the housing degree of protection ordered complies with what is described in the catalog Test procedure 1 The housing degree of protection is identified based on what is stamped on the r...

Page 17: ...net components are installed as specified in the layout diagram and or circuit diagram 3 1 4 Cable installation Fundamentals Visual and mechanical checks are made to ensure that cables and conductors have been installed correctly and are connected correctly according to the circuit diagram Test procedure 1 The customer selects cables or conductors by random sampling 2 The following is inspected Ar...

Page 18: ...e circuit breaker settings are visually checked against what is specified in the circuit diagram Test procedure 1 The customer selects circuit breakers by random sampling 2 The circuit breaker settings are visually checked against what is specified in the circuit diagram Result The test is passed if the circuit breaker settings match what is specified in the circuit diagram 3 1 7 Dimensions Fundam...

Page 19: ...Result The test is passed if the dimensions match with what is specified in the dimension drawing Tests 3 1 Visual inspection SINAMICS DCM 6RN F03 Reference Manual Rev 201902141527 SINAMICS DCM 19 ...

Page 20: ...n equipment is Online 3 2 2 Voltage test Fundamentals As no motor is available in the test station the correct functioning of the excitation equipment is demonstrated using an ohmic resistive load Test procedure 1 The supply voltage stamped on the nameplate is connected at the excitation equipment input 2 An ohmic resistive load is connected at the excitation unit output 3 The excitation unit is s...

Page 21: ...MERGENCY OFF Fundamentals The external EMERGENCY OFF is simulated This checks that in the case of an EMERGENCY OFF command the excitation equipment no longer provides a voltage Test procedure 1 The auxiliary voltage is present 2 To simulate an external EMERGENCY OFF the jumper for the Emergency Stop is opened at the appropriate terminal as shown in the circuit diagram The excitation equipment disp...

Page 22: ...priate plug connector is withdrawn as shown in the circuit diagram The excitation equipment displays 10 x The operating software displays Emergency Stop Safety shutdown 3 The temperature monitoring plug connector is reinserted The excitation equipment displays 7 x or 8 x Ready to switch on The operating software displays Ready to switch on Result The test is successfully passed if the appropriate ...

Page 23: ...CY OFF 21 Temperature monitoring of the de excitation resistor 22 Voltage test 20 Function tests 13 I Insulation test 14 V Visual inspection 12 16 Cable installation 17 Cable markings 18 Dimensions 18 Electrical cabinet components 17 Housing degree of protection 16 Rating plate 16 Setting values of circuit breakers if used 18 SINAMICS DCM 6RN F03 Reference Manual Rev 201902141527 SINAMICS DCM 23 ...

Page 24: ...Index SINAMICS DCM 6RN F03 24 Reference Manual Rev 201902141527 SINAMICS DCM ...

Page 25: ......

Page 26: ...8888888888 000088 01 EN 01 888888888800008801EN01 888888888800008801EN01 Further Information www siemens com drives Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY ...

Page 27: ...6422 Fax 49 911 433 6921 Email motoren doku aud internal siemens co m Our ref 8888888888000088 Date 14 02 2019 Documentation for 6RN Your order no 000010 AL N ECCN N UL DE StWanr CD 85234045 StWanr Print 49011000 Dear Sir Madam Many thanks for your order the documentation for which is enclosed Yours very truly 888888888800008801EN01 ...

Page 28: ......

Page 29: ...Spine label for binder 50 mm 120 g m2 SINAMICS DCM 6RN SINAMICS DCM F03 Tests carried out on drives Spine label for binder 162 mm 120 g m2 SINAMICS DCM 6RN SINAMICS DCM F03 Tests carried out on drives ...

Page 30: ......

Reviews: