![Siemens SINAMICS CONNECT 500 Operating Instructions Manual Download Page 39](http://html.mh-extra.com/html/siemens/sinamics-connect-500/sinamics-connect-500_operating-instructions-manual_1265417039.webp)
7.9
Completing commissioning
1. Create the recovery points for both partitions of the IPC.
2. Disconnect the connection from the local service PC to the IPC/to the converter Control Unit.
3. Withdraw the LAN cable from the SCALANCE switch interface.
4. Close the converter control cabinet.
Commissioning
7.9 Completing commissioning
SINAMICS CONNECT 500
Operating Instructions, 10/2019
37