General specifications
● Pay attention to the instructions on the lubricant plate.
● Regrease in portions. The shaft must rotate so that the new grease can be distributed in
the bearings.
Regreasing the roller bearings prior to commissioning
● If the period between delivery and commissioning is more than a year and less than four
years:
– Re-grease the roller bearings with twice the amount of grease specified on the lubricant
plate.
– Check the bearing temperature, as far as possible.
Regreasing roller bearings before commissioning
You must regrease the roller bearings under the following conditions:
● If the machine has been in storage for more than four years.
● If the machine has not been stored in accordance with the specifications in the "Storage"
section.
Contact the Service Center.
See also
Transport (Page 28)
Service and Support (Page 103)
7.4
Setting the converter pulse frequency
● At the converter, set a minimum pulse frequency of 2.5 kHz in operation. This means that
the guaranteed machine parameters can be maintained.
Start-up
7.4 Setting the converter pulse frequency
SIMOTICS T-1FW4 Heavy Duty 1FW4407-1KM81-1BC0-Z
68
Operating Instructions 11/2018