5.3.9
Putting the machine down
Requirements
The following preconditions must be satisfied before setting down the machine at the
installation location:
● The mating faces must be clean.
● The anti-corrosion protection paint has been removed from the mating faces, such as the
machine mounting feet, flange, ...
● There is no condensation present within the machine.
Setting down the machine
● Set down the machine slowly and carefully at the installation location to avoid any impact.
5.3.10
Roughly aligning the machine
Requirement
The transmission element such as a coupling half has already been pulled on.
Roughly aligning the machine
● For horizontal positioning, push the motor sideways across the foundation. When doing so,
ensure that the axial position is maintained.
5.4
Installing the machine
Note
Service Center
For any installation work that is required, contact the Service Center (Page 117) or commission
service engineers trained by Siemens and authorized for this task.
Assembly
5.4 Installing the machine
SIMOTICS HT Series HT-direct 1FW4...1......A
56
Operating Instructions 11/2018
Summary of Contents for SIMOTICS HT Series
Page 2: ...13 11 2018 16 25 V5 00 ...
Page 10: ...Table of contents SIMOTICS HT Series HT direct 1FW4 1 A 10 Operating Instructions 11 2018 ...
Page 26: ...Description SIMOTICS HT Series HT direct 1FW4 1 A 26 Operating Instructions 11 2018 ...
Page 118: ...Service and Support SIMOTICS HT Series HT direct 1FW4 1 A 118 Operating Instructions 11 2018 ...
Page 122: ...Quality documents SIMOTICS HT Series HT direct 1FW4 1 A 122 Operating Instructions 11 2018 ...
Page 127: ......