Mounting the terminal box
1. Screw in the two threaded bars diagonally at the lower section of the terminal box.
2. Slide the terminal box cover over the threaded bars onto the lower section of the terminal
box.
3. Screw the screws into the free holes and tighten by hand.
4. Release the threaded bars.
5. Tighten all four M10 screws, tightening torque 40 Nm.
6.4
Preparation
6.4.1
Terminal designation
According to IEC / EN 60034‑8, the following basic definitions apply to the terminal
designations for 3-phase machines:
Table 6-1
Terminal designations using the 1U1-1 as an example
1 U 1 - 1 Designation
x
Index for pole assignment for pole-changing machines where applicable. A lower
index signifies a lower speed. Special case for split winding.
x
Phase designation U, V, W
x
Index for winding start (1) or end (2) or if there is more than one connection per
winding
x Additional indices for cases in which it is obligatory to connect parallel power feed
cables to several terminals with otherwise identical designations
6.4.2
Selecting cables
Take the following criteria into account when selecting the connecting cables:
● Rated current
● Rated voltage
● Possibly a service factor
● System-dependent conditions, such as ambient temperature, routing type, cable cross-
section as defined by required length of cable, etc.
● Requirements according to IEC/EN 60204‑1
● Dimensioning for bundled cable routing, e.g. according to DIN VDE 0298 Part 4 or
IEC 60364-5-52
● Requirements according to IEC/EN 60079-14
● Configuration notes
Electrical connection
6.4 Preparation
SIMOTICS FD 1MM1
78
Operating Instructions 02/2019
Summary of Contents for SIMOTICS FD 1MM1 Series
Page 2: ...05 02 2019 16 03 V11 01 ...
Page 30: ...Description SIMOTICS FD 1MM1 30 Operating Instructions 02 2019 ...
Page 142: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1MM1 142 Operating Instructions 02 2019 ...
Page 166: ...Disposal 11 5 Disposal of components SIMOTICS FD 1MM1 166 Operating Instructions 02 2019 ...
Page 168: ...Service and Support SIMOTICS FD 1MM1 168 Operating Instructions 02 2019 ...
Page 172: ...Quality documents SIMOTICS FD 1MM1 172 Operating Instructions 02 2019 ...
Page 177: ......