Installation
38
REVISION 02 * INSTALLATION SIMOSEC * 832-6063.0
Switchgear room
Please observe the following points when selecting and preparing the switchgear room:
• Space to move switchgear into the room
• Room size
• Door dimensions
• Construction and load-bearing capacity of the floor
• Illumination, heating and power supply
• Installation of foundation rails
• Installation of high voltage cables
• Grounding system
Tools / Auxiliary means
Before starting to work on the switchgear, provide the tools / auxiliary means required:
• Angular hex key 10 mm (Allen screwdriver)
• Torx screwdriver T30 M6
• Torque wrench 15 - 27 lbf·ft (20 - 36 Nm)
• Ratchet, 1/4’’ drive
• Extension 1/4’’ drive, length 6’’ (150 mm)
• Sockets, metric, 1/4’’ drive (10 mm, 13 mm, 16 mm, 18 mm)
• Laser level
• Shim plates for adapting for floor unevenness 0.02 - 0.04 in (0.5 - 1.0 mm)
or as needed
• Household cleaner
• Suitable movable lifting device
• Roller crowbars
• Transport rollers