36
Table 14: Function checks
(continued)
Item
Checklist
Notes
C.07
Mechanical operation of the recloser by pulling the lockout
handle:
Recloser opens
LED next to the Close function button is no longer lit
LED next to the Open function button lights up green
Position indicator on the bottom of the recloser switch unit is
green (open).
C.08
Press the Close pushbutton:
No switching operation shall take place.
C.09
Press the Close function button on the control and protection relay
and then press <Enter>:
No switching operation shall take place.
C.10
Push lockout handle back in completely:
Press Close pushbutton or the Close function button on the
control and protection relay and then press <Enter>
Recloser closes
LED next to the Open function button is no longer lit
LED next to the Close function button lights up red
Position indicator on the bottom of the recloser switch unit is
red.
C.11
Switch on miniature circuit breaker CB2:
At external temperatures of < 95 ºF (35 ºC) the heaters heat up
after approximately one minute.
Item
Checklist
Notes
D.01
Adjust the control and protection relay to the desired setting file:
The control and protection relay shows default set in - Group 1
If necessary, select other group with user-specific parameter
settings.
D.02
If applicable, check the voltage and current readings of the
controller.
D.03
Check the date and the time on the controller and correct if
necessary.
D.04
Set trip counter to zero (at initial installation only).
D.05
Delete event memory (at initial installation only):
If necessary, download events for further documentation.
D.06
Close and latch swing panel.
D.07
Install controller cover and fasten.
D.08
Close and secure three-phase type SDR controller door.
Table 15: Final tasks
Summary of Contents for SDR 15.5 kV
Page 39: ...39 ...