RUGGEDCOM WIN7251
Installation Guide
Chapter 2
Installing the Base Station
Unpacking the Base Station
7
1. Review the relevant certification information for any regulatory requirements. For more information, refer to
2. Select an appropriate site and perform a site survey. For more information, refer to
.
3. Unpack and inspect the base station components. For more information, refer to
.
4. Mount the base station to a pole, wall or tower. For more information, refer to
.
5. Install and connect the antenna(s). For more information, refer to
Section 2.6, “Installing Antennas”
.
6. Assemble the PoE cable. For more information, refer to
Section 2.8.3, “Assembling the PoE Connector”
7. For Class I, Division 2 hazardous locations only, connect a RUGGEDCOM WIN1210/WIN1212. For more
information, refer to
Section 2.8.4, “Installing the Hazardous Location Kit”
.
8. Make sure the base station is grounded. For more information, refer to
Section 2.7, “Grounding the Base
9. Connect the base station to a power source and the network. For more information, refer to
10. Seal all cable connections. For more information, refer to
Section 2.9, “Weatherproofing the Base Station”
11. Configure the base station. For more information, refer to
Section 3.2, “Configuring the Base Station”
.
Section 2.2
Unpacking the Base Station
The following items are included in the RUGGEDCOM WIN7251 package:
Item
Quantity
RUGGEDCOM WIN7251 Base Station
1
Pole/wall/tower mounting kit
1
DB9 Female to 3-Pin Male RS232 Cable, 2 m (6.6 ft)
1
Data Adapter
1
GPS Antenna
1
Coaxial cable, 350 mm (13.8 in) long
1
When unpacking the base station, do the following:
1. Inspect the package for damage before opening it.
2. Visually inspect each item in the package for any physical damage.
3. Verify all items are included.
IMPORTANT!
If any item is missing or damaged, contact Siemens for assistance.