Installation instructions
en
17
¡
The surfaces of the appliance are sensitive. Avoid
damaging them during installation.
Installation
Checking the ceiling
1.
Check whether the ceiling is horizontal and ad-
equately load-bearing.
The max. weight of the appliance is 40 kg.
Do not fit the appliance directly onto plasterboard
(or similar lightweight materials) in a suspended
ceiling.
2.
Drill the hole depth in accordance with the length of
the screws.
3.
Install the appliance with a fixing material which is
sufficiently stable and has been adjusted accord-
ingly for both the structural conditions and the
weight of the appliance.
4.
Check the cut-out area for existing cables of other
appliances.
Preparing the ceiling
1.
Cover the hob to prevent damage.
2.
Determine the position of the appliance and,
thereby, the centre based on the position of the
hob.
3.
Using the drilling template, measure and mark the
positions of the fastening screws.
The bottom edge of the appliance is identical to the
lower edge of the drilling template.
4.
Ensure that there are no electrical wires, gas pipes
or water pipes in the area where holes are to be
drilled.
5.
Drill four holes with a diameter of 6 mm for the fix-
ing.
6.
Drill the hole depth in accordance with the length of
the screws.
7.
Screw the fastening screws into the ceiling.
8.
Screw in the threaded rods.
9.
Screw the nuts approx. 10 mm onto the threaded
rods.
4
13
Preparing the appliance
1.
Remove the grease filters.
To avoid causing damage, do not bend the grease
filters.
2.
Loosen the screws on the side covers.
20
3.
Open the odour filter cartridge.
Summary of Contents for LR18RPU25
Page 23: ......