Commissioning
6
41 | 50
Building Technologies
008109_m_en_--
Fire Safety
2016-02-09
6 Commissioning
The devices are commissioned via the control panel. The exact procedure is
described in the control panel documentation.
Conduct a performance check once commissioning is complete.