Air Duct Sampling Tube Pressure Measurement

The Model PDM-3 Pressure Differential Measuring device
should be used to ensure that the sampling tube pressure
differential is within the specified limits. The differential pressure
between the two tubes should be greater than 0.01 inches of
water and less than 1.2 inches of water. Qualified personnel
should take measurements in accordance with the PDM-3
instructions, P/N 315-085535.

WIRING

Conduit Knockouts
To remove plastic knockout, first cut the plastic tab on the
specific knockout. Refer to Figure 4 to locate the tab.  Then,
using a screw driver placed at the tab location, tap with a
hammer until the knockout breaks out. Clean the hole before
installing conduit.

3/4” KNOCKOUTS

1/2” KNOCKOUT

PLASTIC

TAB

                                  Figure 4
                                  Removing the Knockouts

Wiring

FDBZ492-PR terminal wiring connections are shown in Figure 5.

Note any limitations on the number of detectors and restrictions on
the use of remote devices permitted for each circuit.

Do not use looped wire under

Do not use looped wire under

Do not use looped wire under

Do not use looped wire under

Do not use looped wire under t

 t

 t

 t

 terminals.

erminals.

erminals.

erminals.

erminals. Break wire run to

 Break wire run to

 Break wire run to

 Break wire run to

 Break wire run to

pro

pro

pro

pro

provide for

vide for

vide for

vide for

vide for proper

 proper

 proper

 proper

 proper supervision of connect

 supervision of connect

 supervision of connect

 supervision of connect

 supervision of connections.

ions.

ions.

ions.

ions.

With detector head removed, connect one of the appropriate
dedicated power sources to the applicable terminals (Refer to
Figure 5). Replace detector head and depress the cover removal
switch (SW1) on the PCB assembly and the unit will be ener-
gized. The green power LED will be illuminated, and when
pressing the test/reset button (SW2) on the PCB assembly, the
red alarm LED will be illuminated. This test confirms the correct
basic operation of the duct smoke unit, excluding the detector
head (see functional testing).

Wire the FDBZ492-PR as a stand alone unit as shown in Figure 6.
Wire the FDBZ492-PR as part of a FACP as shown in Figure 7.
Wire the FDBZ492-PR accessories as shown in Figures 7 and 8.

Summary of Contents for FDBZ492-PR

Page 1: ... of products of combust control of products of combust control of products of combust control of products of combust control of products of combustion in a duct sy ion in a duct sy ion in a duct sy ion in a duct sy ion in a duct syst st st st stem em em em em They are They are They are They are They are not to be used as a subst not to be used as a subst not to be used as a subst not to be used as...

Page 2: ... A 92A R A 92A R A 92A Recommended P ecommended P ecommended P ecommended P ecommended Pract ract ract ract ractice for ice for ice for ice for ice for Smok Smok Smok Smok Smoke Control e Control e Control e Control e Control S S S S Sy y y y yst st st st stems ems ems ems ems This unit is not intended for open area protection nor should it be used for early warning detection or to replace a regul...

Page 3: ...a e l b u o r t n i s i r o t c e t e D 5 1 1 E P 4 5 8 8 C 1 1 E P 1 2 1 P O d e R m r a l A 2 1 1 E P 4 5 8 8 C 1 1 E P s e h s a l F o N r i a p e r s e r i u q e r r o d e r e w o p t o n s i r o t c e t e D _ _ 1 2 1 P O s e h s a l F o N r o d e r e w o p t o n s i r o t c e t e D d e d e e n s i t n e m e c a l p e r _ _ MOUNTINGTHE AIR DUCT HOUSING Location on Duct System This guideline co...

Page 4: ...lters will be detected but if the filters become blocked insufficient air flow through the duct unit will prevent the correct operation of the duct detector Duct units installed in the supply air side may monitor upstream equipment and or filters Figure 2 Recommended Locations in Duct Systems RETURN AIR SUPPLY AIR AIR DUCT HOUSING AIR DUCT HOUSING DAMPER BLOWER FILTER PLENUM FRESH AIR INTAKE DAMPE...

Page 5: ... duct widths of 3 0 to 5 0 requires support ST 100 For duct widths of 5 0 to 10 0 requires support This model is supplied as two 5 ft sections with a coupling Assembly is required for installation Eac Eac Eac Eac Each model is manufact h model is manufact h model is manufact h model is manufact h model is manufactured with a dif ured with a dif ured with a dif ured with a dif ured with a different...

Page 6: ...aining position Once the tube is installed rotate the retainer back into place and tighten screw Mounting After securing the input and outlet tubes to the duct smoke unit or initially placing the tubes through the 1 holes drilled or punched in the HVAC duct to accept the input and outlet tubes and then attaching them to the duct unit hold the duct unit assembly in position and use 2 12 X 3 4 sheet...

Page 7: ...r each circuit Do not use looped wire under Do not use looped wire under Do not use looped wire under Do not use looped wire under Do not use looped wire under t t t t terminals erminals erminals erminals erminals Break wire run to Break wire run to Break wire run to Break wire run to Break wire run to pro pro pro pro provide for vide for vide for vide for vide for proper proper proper proper prop...

Page 8: ... a m r o n n i n e p O t c a t n o c O N y a l e r e l b u o r T 0 1 B T 0 1 T C E N N O C R E T N I E T O M E R S E I R O S S E C C A T N C L T R t s e t o t C D V 4 2 y l p p A m r a l a t s e T 1 1 B T e l b u o r t s t c e t e d t i n u n e h w C D V 4 2 s e t o m e r r o f t u p t u o e l b u o r t t n e r r u c w o L 2 1 L T R C d n u o r G 3 1 L T R C t u p t u o C D V 4 2 4 1 1 L A d e t c...

Page 9: ...sponse See Figure 5 for terminal block connections EOL End of Line for Specific FACP FDBZ492 PR FDBZ492 RTL C RTL GREEN RED LED RTL CNT C RTL KEY SWITCH NORMAL TEST 5 6 1b See Figure 5 for terminal block connections AL1 AL1 FACP NO FACP NO C C C C FACP COM FACP COM FDBZ492 PR 1 FDBZ492 PR X All alarm relays operate with single alarm Individual horn strobe units operate on alarmed detector only 30 ...

Page 10: ...vityTest The detectors monitor their smoke sensitivity automatically and require no test equipment A green flash of the detector LED or in the FDBZ492 RTL Remote Accessory indicates that the smoke sensitivity is within its listed limits FunctionalTest SmokeTesting UsingTG 11 smoke test canister with testing nozzle model AD TGN purchased separately available from Siemens Industry Inc insert the tes...

Page 11: ... PE 1 PE 11C or 1C or 1C or 1C or 1C or 8853 to be disassembled by an 8853 to be disassembled by an 8853 to be disassembled by an 8853 to be disassembled by an 8853 to be disassembled by any y y y yone other one other one other one other one other than an than an than an than an than an authoriz authoriz authoriz authoriz authorized Siemens Industry ed Siemens Industry ed Siemens Industry ed Sieme...

Page 12: ...P 3 M E T S Y S 5 3 P C 2 2 2 0 9 4 8 0 5 1 3 N P Q I L X M L X M 6 B 1 M Z C 9 5 5 3 5 9 0 5 1 3 N P Q I L X M L X M 4 M Z C 0 1 6 2 8 0 9 0 5 1 3 N P M Z H 1 0 9 C F 4 2 9 C F 2 2 9 C F 5 0 0 2 C F 5 2 0 2 C F 0 5 0 2 C F 0 5 2 S F S L X r e d n i F e r i F 6 0 5 8 4 3 0 5 1 3 N P X E L X S 8 7 9 9 5 9 0 5 1 3 N P X E L X S X 4 E Z S 8 8 1 0 6 9 0 5 1 3 N P X E L X S X A 8 E Z S 8 2 2 0 6 9 0 5 ...

Reviews: