Siemens FDBZ492-PR Installation Instructions Manual Download Page 10

P/N A6V10330327_a_en

Siemens Industry, Inc.
Building Technologies  Division

10

In the event of a fire alarm, certain equipment may be required
to be shut down. For example, shut down may be achieved by
interrupting the fan supply source to that particular piece of
equipment when wired as indicated in Figure 6.

Installation Of Smoke Detectors

To Install:

Remove cover by loosening the four screws. Take off the
cover and set it aside.

Align detector with base and insert detector.

Rotate detector clockwise while gently pressing on it until
the detector drops fully into base.

Then rotate the detector clockwise until it stops and snaps
in place.

Replace cover and tighten the four screws.

To Remove:

Rotate the detector counterclockwise until stop is reached.

Pull detector out of base.

TESTING

Only qualified service personnel should test these units. To
assure proper operation of the detector and control panel, both
the Sensitivity and the Functional tests should be conducted.
The minimum test schedule may be found in the current edition
of NFPA 72 for installations in the U.S

Sensitivity Test

The detectors monitor their smoke sensitivity automatically and
require no test equipment. A green flash of the detector LED or
in the FDBZ492-RTL Remote Accessory indicates that the
smoke sensitivity is within its listed limits.

Functional Test

Smoke Testing
Using TG-11 smoke test canister with testing nozzle model
AD-TGN (purchased separately) available from Siemens Industry,
Inc., insert the test gas nozzle into the hole in the red plug in the
unit cover. Press can against cover for about 

1

/

2

 second to

release gas into the chamber.

Do not spra

Do not spra

Do not spra

Do not spra

Do not spray g

y g

y g

y g

y gas for

as for

as for

as for

as for more than ½ second.

 more than ½ second.

 more than ½ second.

 more than ½ second.

 more than ½ second. Overuse of  t

 Overuse of  t

 Overuse of  t

 Overuse of  t

 Overuse of  test

est

est

est

est

g

gg

g

gas ma

as ma

as ma

as ma

as may result in det

y result in det

y result in det

y result in det

y result in detector

ector

ector

ector

ector cont

 cont

 cont

 cont

 contaminat

aminat

aminat

aminat

amination.

ion.

ion.

ion.

ion.

After 15 to 20 seconds the detector will go into alarm, illuminat-
ing the detector LED and causing the duct unit functions to
operate; alarm relays will change state, and the alarm related
remote accessories, if attached, will function.

Summary of Contents for FDBZ492-PR

Page 1: ... of products of combust control of products of combust control of products of combust control of products of combust control of products of combustion in a duct sy ion in a duct sy ion in a duct sy ion in a duct sy ion in a duct syst st st st stem em em em em They are They are They are They are They are not to be used as a subst not to be used as a subst not to be used as a subst not to be used as...

Page 2: ... A 92A R A 92A R A 92A Recommended P ecommended P ecommended P ecommended P ecommended Pract ract ract ract ractice for ice for ice for ice for ice for Smok Smok Smok Smok Smoke Control e Control e Control e Control e Control S S S S Sy y y y yst st st st stems ems ems ems ems This unit is not intended for open area protection nor should it be used for early warning detection or to replace a regul...

Page 3: ...a e l b u o r t n i s i r o t c e t e D 5 1 1 E P 4 5 8 8 C 1 1 E P 1 2 1 P O d e R m r a l A 2 1 1 E P 4 5 8 8 C 1 1 E P s e h s a l F o N r i a p e r s e r i u q e r r o d e r e w o p t o n s i r o t c e t e D _ _ 1 2 1 P O s e h s a l F o N r o d e r e w o p t o n s i r o t c e t e D d e d e e n s i t n e m e c a l p e r _ _ MOUNTINGTHE AIR DUCT HOUSING Location on Duct System This guideline co...

Page 4: ...lters will be detected but if the filters become blocked insufficient air flow through the duct unit will prevent the correct operation of the duct detector Duct units installed in the supply air side may monitor upstream equipment and or filters Figure 2 Recommended Locations in Duct Systems RETURN AIR SUPPLY AIR AIR DUCT HOUSING AIR DUCT HOUSING DAMPER BLOWER FILTER PLENUM FRESH AIR INTAKE DAMPE...

Page 5: ... duct widths of 3 0 to 5 0 requires support ST 100 For duct widths of 5 0 to 10 0 requires support This model is supplied as two 5 ft sections with a coupling Assembly is required for installation Eac Eac Eac Eac Each model is manufact h model is manufact h model is manufact h model is manufact h model is manufactured with a dif ured with a dif ured with a dif ured with a dif ured with a different...

Page 6: ...aining position Once the tube is installed rotate the retainer back into place and tighten screw Mounting After securing the input and outlet tubes to the duct smoke unit or initially placing the tubes through the 1 holes drilled or punched in the HVAC duct to accept the input and outlet tubes and then attaching them to the duct unit hold the duct unit assembly in position and use 2 12 X 3 4 sheet...

Page 7: ...r each circuit Do not use looped wire under Do not use looped wire under Do not use looped wire under Do not use looped wire under Do not use looped wire under t t t t terminals erminals erminals erminals erminals Break wire run to Break wire run to Break wire run to Break wire run to Break wire run to pro pro pro pro provide for vide for vide for vide for vide for proper proper proper proper prop...

Page 8: ... a m r o n n i n e p O t c a t n o c O N y a l e r e l b u o r T 0 1 B T 0 1 T C E N N O C R E T N I E T O M E R S E I R O S S E C C A T N C L T R t s e t o t C D V 4 2 y l p p A m r a l a t s e T 1 1 B T e l b u o r t s t c e t e d t i n u n e h w C D V 4 2 s e t o m e r r o f t u p t u o e l b u o r t t n e r r u c w o L 2 1 L T R C d n u o r G 3 1 L T R C t u p t u o C D V 4 2 4 1 1 L A d e t c...

Page 9: ...sponse See Figure 5 for terminal block connections EOL End of Line for Specific FACP FDBZ492 PR FDBZ492 RTL C RTL GREEN RED LED RTL CNT C RTL KEY SWITCH NORMAL TEST 5 6 1b See Figure 5 for terminal block connections AL1 AL1 FACP NO FACP NO C C C C FACP COM FACP COM FDBZ492 PR 1 FDBZ492 PR X All alarm relays operate with single alarm Individual horn strobe units operate on alarmed detector only 30 ...

Page 10: ...vityTest The detectors monitor their smoke sensitivity automatically and require no test equipment A green flash of the detector LED or in the FDBZ492 RTL Remote Accessory indicates that the smoke sensitivity is within its listed limits FunctionalTest SmokeTesting UsingTG 11 smoke test canister with testing nozzle model AD TGN purchased separately available from Siemens Industry Inc insert the tes...

Page 11: ... PE 1 PE 11C or 1C or 1C or 1C or 1C or 8853 to be disassembled by an 8853 to be disassembled by an 8853 to be disassembled by an 8853 to be disassembled by an 8853 to be disassembled by any y y y yone other one other one other one other one other than an than an than an than an than an authoriz authoriz authoriz authoriz authorized Siemens Industry ed Siemens Industry ed Siemens Industry ed Sieme...

Page 12: ...P 3 M E T S Y S 5 3 P C 2 2 2 0 9 4 8 0 5 1 3 N P Q I L X M L X M 6 B 1 M Z C 9 5 5 3 5 9 0 5 1 3 N P Q I L X M L X M 4 M Z C 0 1 6 2 8 0 9 0 5 1 3 N P M Z H 1 0 9 C F 4 2 9 C F 2 2 9 C F 5 0 0 2 C F 5 2 0 2 C F 0 5 0 2 C F 0 5 2 S F S L X r e d n i F e r i F 6 0 5 8 4 3 0 5 1 3 N P X E L X S 8 7 9 9 5 9 0 5 1 3 N P X E L X S X 4 E Z S 8 8 1 0 6 9 0 5 1 3 N P X E L X S X A 8 E Z S 8 2 2 0 6 9 0 5 ...

Reviews: