P/N A6V10330327_a_en
Siemens Industry, Inc.
Building Technologies Division
4
confirmation of velocity and pressure differential within
specifications is required.
The pressure differential between the input sampling (high
pressure) tube and outlet (low pressure) tube for the
FDBZ492-PR smoke duct detector should be greater than
0.01 inches of water and less than 1.2 inches of water.
3)
Identify a code compliant location (supply or return side, or
both) for the installation of the duct unit that will permit
easy access for viewing and serviceability.
4)
When installing on the return side, install duct units prior to
the air being exhausted from the building or diluted with
outside “fresh” air.
5)
When installing duct smoke units downstream of filters,
fires occurring in the filters will be detected, but if the filters
become blocked, insufficient air flow through the duct unit
will prevent the correct operation of the duct detector. Duct
units installed in the supply air side may monitor upstream
equipment and/or filters.
Figure 2
Recommended Locations in Duct Systems
RETURN
AIR
SUPPLY
AIR
AIR DUCT
HOUSING
AIR DUCT
HOUSING
DAMPER
BLOWER
FILTER
PLENUM
FRESH AIR INTAKE
DAMPER
TYPE A: CLOSED SYSTEM - NO EXHAUST
D
D
TYPE B: PROVISION FOR EXHAUSTING
SOME PERCENTAGE OF RETURN AIR
RETURN
AIR
SUPPLY
AIR
AIR DUCT
HOUSING
AIR DUCT
HOUSING
DAMPER
DAMPER
BLOWER
FILTER
PLENUM
FRESH AIR INTAKE
DAMPER
D
D
EXHAUST AIR
OUTPUT
DAMPER
TYPE C: RETURN AIR UNDER POSITIVE PRESSURE
FROM SEPARATE BLOWER
EXHAUST AIR
OUTPUT
DAMPER
RETURN
AIR
SUPPLY
AIR
AIR DUCT
HOUSING
RETURN AIR
BLOWER
AIR DUCT
HOUSING
DAMPER
DAMPER
BLOWER
FILTER
PLENUM
FRESH AIR INTAKE
DAMPER
D
D
Figure 1
Typical Mounting of Duct Housing
OUTLET
TUBE
INPUT
SAMPLING
TUBE
CENTER
LINE
OF DUCT
CL