Installation and Commissioning
B3–10
CP 443-5 Basic for PROFIBUS / Manual Part B3 –
Release 11/2002
C79000-G8976-C161-03
Installation and Commissioning
Procedure / Steps
Table 3-1
Step
Explanation / Meaning
1. Insert the CP 443-5
Basic
The CP 443-5 Basic can be inserted in all racks with slots for P and K bus
attachment:
S
Central rack CR2
S
Universal rack UR1, UR2 or UR2H
as central rack
as expansion rack with rack no. 1–6
Note
When using the universal rack as an extension rack, you require an IM with a communication bus link!
The CP 443-5 Basic cannot be operated in an ER1 or ER2 expansion rack
(no K bus link possible).
Suitable slots in the rack:
With the exception of the slots reserved for the power supply and IM-R, the
CP 443-5 Basic can be inserted in all slots with a P and K bus interface (in
the central or in an expansion rack no. 1–6).
2. Attachment to
PROFIBUS
Note the information in the General section of this manual.
Note
When using the CR2 rack, the CPU and CP must be plugged into the same segment if you want to use
FDL/FMS connections.
3. Configuration
Depending on the communication services being used, configuration involves
the following steps:
S
Node initialization
This is necessary in all situations. This assigns a PROFIBUS address
and bus parameters to the PROFIBUS CP. For details, refer to /4/
S
Configuring connections:
This is necessary when using the communication services, S7 functions
and FDL connections (SEND/RECEIVE interface). For details, refer to /5/
or /4/.
4. PG/PC Attachment
for Configuration
You can connect the PG when configuring the CP as follows:
S
via MPI
S
via LAN / PROFIBUS
The CP 443-5 Basic must already have a PROFIBUS address (for details
of node initialization, refer to /4/).