S I E M E N S
P T E L T D
C62 Level 2 Service Manual
Copyright © Siemens Pte Ltd.
C62 Level 2 manual V1.1
All Rights Reserved
ICM MP CCQ SLI RHQ
18 of 47
Internal Use Only
Step 13 (Domesheet)
Detach the new domesheet from the
protection foil with the tweezers.
Step 14
Place the domesheet on the domesheet
assembly jig with the glue surface upwards.
Step 15
Ensure that the domesheet is properly
aligned with the pins in the jig.
Step 16
Place the PWB onto the jig through the two
(2) pins, which align the PWB on the correct
position.
Step 16
The domesheet is now glued to the PWB.
Step 17 (Antenna Connector)
Push the pins downwards until locked in the
holes.