Result
The test is passed if the drive responds as described above.
3.2.6
DC-link pulsed operation at 0 Hz
Fundamentals
The actual current values currently measured at the drive output at 0 Hz DC-link pulsing
frequency are displayed with reduced DC-link current with a short-circuited drive output on the
motor side.
Test procedure
1. The auxiliary voltage is present.
2. The rated voltage or a reduced voltage is applied to the rectifier input.
3. The DC-link pulsing frequency is set to 0 Hz.
4. The actual values of the input voltage and the DC-link current are displayed on the test
station computer and documented in the "Functional Test Plan."
Result
The test is passed if direct current is flowing at the drive output.
3.2.7
DC-link pulsed operation at 2 Hz
Fundamentals
At a DC-link pulsed operation of 2 Hz, all of the inverter thyristors are controlled. The test is
performed with reduced DC-link current with a short-circuited drive output on the motor side.
Test procedure
1. The auxiliary voltage is present.
2. The rated voltage or a reduced voltage is applied to the rectifier input.
3. The DC-link pulsing frequency is set to 2 Hz.
The current electrical values are displayed on the test station computer.
Result
The test is passed if alternating current is flowing at the drive output.
Tests
3.2 Function test
SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11
24
Reference Manual Rev.201902141423 GL150 wassergekühlt