2.4
Insulation test
The insulation resistance is measured before and after the high-voltage test. The insulation test
can only be ordered and carried out together with the function test (F72, F73).
Insulation test
Order codes
Without the
customer
present
With the cus‐
tomer
present
● High-voltage test
● Measuring the insulation resistance
F76
F77
The successful test is confirmed in a 3.1 certificate – or in the case that the customer has
ordered the acceptance test, in a 3.2 certificate.
See also
Insulation test (Page 33)
The insulation test is performed on a separate acceptance day prior to the function test.
General scope of services
2.4 Insulation test
SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11
14
Reference Manual Rev.201902141423 GL150 wassergekühlt