Safety, approvals, EMC
7.2 Test voltage
SITOP PSU6200 3ph
50
Equipment Manual, 02.2020, A5E44623402-1-76
7.2
Test voltage
Figure 7-1
Test voltage diagram
Only the manufacturer can perform the type test and production test; users can also perform
the field test.
Preconditions for performing the field test:
Test (A)
●
Connect input terminals (L1, L2, L3) with one another, connect output terminals and
signaling contact with one another – and measure with respect to one another
Test (B)
●
Connect input terminals (L1, L2, L3) with one another, and measure with respect to PE
Test (C)
●
Connect the output terminals and signaling contact with one another and measure with
respect to PE
Table 7- 1
Test voltage
Test time
Prim
↔
sec (A)
Prim
↔
PE (B)
Sec
↔
PE (C)
Type test
60 s
4200 V DC
3350 V DC
850 V DC
Production test
1 s
4200 V DC
3350 V DC
850 V DC
Field test
1 s
4200 V DC
3350 V DC
850 V DC
Remark:
Tripping current for DC measurement: max. 10 mA
Summary of Contents for 6EP3433-7SB00-0AX0
Page 8: ...Safety instructions SITOP PSU6200 3ph 8 Equipment Manual 02 2020 A5E44623402 1 76 ...
Page 22: ...Mounting removal SITOP PSU6200 3ph 22 Equipment Manual 02 2020 A5E44623402 1 76 ...
Page 54: ...Ambient conditions SITOP PSU6200 3ph 54 Equipment Manual 02 2020 A5E44623402 1 76 ...
Page 62: ...Environment SITOP PSU6200 3ph 62 Equipment Manual 02 2020 A5E44623402 1 76 ...