
IV431E REV. 00 Issued: 2020/11/16 User Manual Soleil SPX 200K-250K
Pag. 11 of 76 +FR
1.2 Operator Requirements
The operation and wiring for inverter should be performed by qualified person, which is to ensure that
the electrical connection meets the related standards.
The professional technicist must meet the following requirements:
l
Be trained strictly and understand all safety announcements and master correct operations.
l
Fully familiar with the structure and working principle of the whole PV grid-tied generation system.
l
Know well about the related standards of local country and district.