DESCRIPTION

The SK-8RG automatic processor accurately tempers each solution, one at a time. This
design breakthrough allows B/W processing at 75 

o

F and then immediately  afterwards

slide processing  100 

o

F. Tempered water is not needed. Long warm-ups are not

required.

All the solution bottles for processing color slides, color negatives and Black and White
negatives are constantly connected. The operator just selects the process. The unit
pumps the proper chemical from any of the 18 reservoir containers, quickly heats the
small volume needed to the correct temperature and starts processing. As it processes
one solution it prepares the next solution. At the end of the process cycle it automatically
flushes itself clean, preparing itself for the next process.

The SK-8RG is compact (26” wide by 14” high by 16” deep). The process drum is
removable for loading in a dark box or bag. The SK-8RG can process 8 rolls of 35, 5 rolls
of 120/220, 8 sheets of 4x5 or 18 disc films at one time. Two chemicals can be
automatically saved from each process for silver recovery or reuse. Fresh developer is
used for quality. The standard processes are pre-programmed, but the developer time
can be easily changed when desired.

The SK-8RG protects the film from possible operator errors. It has an interactive
computerized display that prompts and informs the operator what it is doing. Possible
operator errors are also minimized because, chemical lines do not have to be switched
nor must volumes of solutions  be measured.

SETTING UP THE UNIT

The unit comes packed in 2 boxes. Make sure you received the following:
... Main processor SK-8RG
... 8-reel and a 4-reel black processing drum with lids
... 8-reel and a 4-reel spindle
... 10 plastic film reels
... Spacer 2-roll (white fat donut)
... Turbo dryer tube. (White plastic 4” diameter 11” long)
... Coil of ¼” flexible tubing
... Power cord
... Six ½ gal. (2 liter) solution bottles with fittings
... Six 1 gal. bottles
... Two Metering valves
... Two 1 Gal replenishing bottles with bladders
... Two 1 gal. collapsible bottles
... Water bottle (5 gal) with float valve
... “Ice Maker” kit to connect water bottle to water pipe
... Dump bottle (5 gal) with level sensor and cap with
      3” gray plastic fitting to hold two dump tubes
... 10 Film Clamps for 120/220 film.(white curved plastic pieces)
... Plug to seal COUPLING when FLUSHING
... Syringe of silicone grease
... Allen wrench (1/16”) for bushings
... Magnetic stirrer. A white “pill” (3/8” x 1”)
... Permanent marker
... Piece of Scotch Brite

tm

... Set-up video
... This instruction book

Summary of Contents for SK-8RG

Page 1: ...4 Processing 10 Push processing 5 Drying 10 Disc processing 6 Reel loading 11 4x5 processing 7 Special functions 12 Automatic replenishing 7 Maintenance 15 Service 8 Alarms and messages 18 Parts list...

Page 2: ...sses are pre programmed but the developer time can be easily changed when desired The SK 8RG protects the film from possible operator errors It has an interactive computerized display that prompts and...

Page 3: ...can run in any direction Allow about 2 feet 60 cm extra for slack Label both ends of the tubing with the chemical name Slip one end over the proper tube and the other end over the exposed black tubing...

Page 4: ...close to unit Fig 1 Run tubing directly to DUMP bottle Fig 1 Cut off unneeded length of dump tubing Fig 1 Run the DUMP and the FLUSH tubing separately into the 3 gray fitting on the DUMP bottle Do not...

Page 5: ...ols the warm air blowing on the DRUM This fine tunes the solution to an accurate temperature for very consistent results When one solution is finished it is drained out and the prepared solution in th...

Page 6: ...y Paterson tm reels will work They are available at most photo stores Contact Photo Therm if you prefer to use different style reels 35 MM FILM Cut off the film leader Clip the corners of the leading...

Page 7: ...d but not touching the bottom of the heat tank A glass or dial thermometer will not work The temperature can be adjusted with a small screwdriver through a hole on the left side of the unit Clockwise...

Page 8: ...NOT TURN UNIT OFF until you check why A continuous series of short buzzes signals that the unit requires attention Read the message in the display to find out what needs to be done Check Dev etc mean...

Page 9: ...tone Run for at least 2 hours a day The bleach is SAVED in this process because of its cost If you wish to save a different chemical let us know Check reversal for scum growth discard clean bottle re...

Page 10: ...plastic and process normally DISC DRYING When the processor says INSERT PLUG push the disc dryer assembly into the coupling as if it was a normal processing DRUM Insert the cord from the dryer into t...

Page 11: ...other hand to help guide the sheets After all the sheets have been loaded rotate the stainless clips toward the outside ring to hold in the sheets The spindle should then be inserted from the bottom o...

Page 12: ...nishment rate The REPLENISHING BOTTLE contains both the used solution and the fresh replenisher solution The replenishing solution is held in the internal BLADDER which equalizes solution heights for...

Page 13: ...13...

Page 14: ...a red tinge increase the bleach replenishment rate and or make sure the bleach is aerated You can usually re bleach the film to correct the problem CALIBRATING THE METERING VALVE If you wish to check...

Page 15: ...ing while the spindle is being pulled in Adjust by mounting the STAPLE closer to the motor Machine failure message Temperature sensor problem Check ribbon connector from heat tank Make sure it is push...

Page 16: ...16...

Page 17: ...he clamp With a paper towel in hand remove the SV tubing from the pump fitting Remove the ribbon connector of the SV from the PC board Carefully lift the connector straight up Do not bend the pins The...

Page 18: ...and wipe up any loose solutions Tie down the 2 pumps through the holes in the base with strong twine Remove the magnetic stirrer white pill from inside the heat chamber Close the unit Remove and keep...

Page 19: ...19 blank sheet for page count insert wiring diagram...

Page 20: ...553 2001 Porters Get catalog Has Rexton Hyperwet 35 0597 a B W rinse 708 833 0300 McMasters Ask for catalog Has silicone grease 1418K4 800 537 9724 United Plastics Ask for catalog Good source for bot...

Reviews: