6
SXP80/185T & SXP100/185T External stern thruster assembly
1.0.2 - 2016
Model
Voltage Nominal
current
draw
Min. battery
CCA
>7m total + & - 7-14m total + & - 15-21m total + & - 22-28m total + & - 28-35m total + & - 36-45m total + & -
Min.
Rec. Min.
Rec.
Min.
Rec.
Min.
Rec.
Min.
Rec.
Min.
Rec.
SX80/185T
12 V
530 A
DIN: 550
SAE:1045
mm
2
AWG
60
2/0
70
2/0
95
3/0
2x 70
2x 2/0
2x 70
2x 2/0
2x 95
2x 2/0
2x 95
2x 3/0
270*
2x 120
2x 4/0
340*
NA
NA
24 V
260 A
DIN: 300
SAE: 570
mm
2
AWG
25
1
35
1
35
1
50
1/0
60
2/0
70
2/0
70
2/0
95
3/0
95
3/0
120
4/0
120
4/0
2x 95
2x 3/0
SX100/185T
12 V
740 A
DIN: 750
SAE: 1425
mm
2
AWG
95
3/0
95
3/0
2x 70
2x 2/0
2x 95
2x 3/0
2x 95
2x 3/0
280*
250*
375*
NA
NA
NA
NA
24 V
340 A
DIN: 400
SAE: 760
mm
2
AWG
35
1
50
1/0
50
1/0
70
2/0
60
2/0
95
3/0
95
3/0
120
4/0
120
4/0
2x 95
2x 3/0
2x95
2x 3/0
2x 120
2x 4/0
Minimum and recommended cable dimensions can be identical due to safety margins and cable heat considerations for short cable lenghts.
* Minimum or recommended cable cross section in mm
2
Battery & cable recommendations:
•
Explanation of electrical table
- All cable lengths are the total of A+B+C+D+E in Fig. 1.
- Battery size is stated as minimum cold crank capacity, not Ah.
- Use slow fuse rated to hold stated Amp-Draw for min. 5 minutes.
•
It is important that you use a good cable size and batteries with a high cranking capacity to feed the thruster, because it is the actual voltage at the
motor while running the thruster that decides the output rpm of the motor and thereby the actual thrust. Please see the list below for advised min.
sizes of cables and batteries. You can of course use larger cables for even better results.
•
A main switch that can take the load without noticeable voltage drop must be installed in the main positive lead so the power for the thruster can be
turned off independent of the rest when not on board or in emergencies. This should be placed in an easy accessible place and the boats instruc
-
tions should inform that this should be turned off like the boat’s other main switches.
•
We also advice to install a fuse in the positive lead for protection against short circuiting of the main cables. This fuse should be of a adequate quality
which normally means that it is physically large as these have less voltage drop than the simple / small ones. It should be of the slow type and sized
to take the amperage draw for at least 5 minutes.
•
It is highly recommended to install a Side-Power Automatic Main Switch 897712 (12V) eller 897724 (24V). The AMS will be activated when the panel
is turned on, contains an automatic short circuit fuse and a manual emergency stop. The AMS will also provide feedback to the panel regarding evt.
faults.
•
The cable ends must be fitted with terminals and these must be well isolated against contact with anything but the proper connection point.
•
Terminals must be properly tightened. Secure/hold inner nut when tightening (Fig. 2). Tighten ø10mm / 3/8" bolt with 15 Nm/11lb/ft.
Electrical installation
Fig. 1
Fig. 2
Thruster
Battery
12/24V
Manual or
automatic
Main switch
Fuse
Proportional Power Controller PPC 800
190x300x145mm (w x h x d)
Thruster motor
5m fixed multicable
Min.
100mm
Min.
100mm
Min.
200mm
<5m
The Proportional Power Controller PPC800 is a bulkhead
(wall) mounted unit and must be installed in a dry and well
ventilated compartment.The unit also requires a 200mm
minimum head clearance and a 100 mm minimum
clearance surrounding its remaining outer casing.
4X
PPC
A
B
C
D
E
MOTOR
NB:
The Proportional Power Controller is a bulkhead
(wall) mounted unit and must be installed in a dry and
well ventilated compartment. The unit also requires
a 200 mm minimum head clearance and a 100 mm
minimum clearance surrounding its remaining outer
casing.
S-link control cables -
See page 15