
Installation
FLPS Multibarrier · Operating Instructions · 8021769/V1-0/2018-03 · © SICK Engineering GmbH
27
Su
bj
ect
to
ch
an
ge
with
ou
t n
otic
e
4.4
Function check
After finishing the installation work described in
, switch on the power supply to
the device.
The blue, green and/or yellow LEDs are on and signal the correct power supply of the gas
flow meter.
The red LED “Fuse failed” is off.
Figure 10
Function check
IMPORTANT:
Check for correct wiring and function of the FLPS Multibarrier prior to commis-
sioning.
)
O.0
)
O.1
DO.3
2b 2a
DO.2
Vcl/Vout
1b 1a
RX2/TX2
RX1/TX1
Vaux
Fu s e
failed
FLPS2-60042-S-5
-FI.1+
- +
-FI.0+
2B 2A
-DI.3+
- +
-DI.2+
1B 1A
-FO.0+
-FO.1+
-DO.2+
-DO.3+
1b 1a
2b 2a
Part
No.
20981
FO.0
DO.3
DO.2
FO.1
2b 2a
Ethernet
RX2/TX2
RX1/TX1
Vaux
F us e
failed
FLPS2-6004E-S-5
-FI.1+
-FI.0+
- +
2B 2A
-DI.3+
-DI.2+
- +
1B 1A
-FO.1+ -FO.0+
-DO.3+ -DO.2+
2b 2a
Vcl/Vout
Part No. 2098136
FLPS2-60042-S-5
FLPS2-6004E-S-5