Installation
FLPS Multibarrier · Operating Instructions · 8021769/V1-0/2018-03 · © SICK Engineering GmbH
19
Su
bj
ect
to
ch
an
ge
with
ou
t n
otic
e
4.2
Mounting
▸
DIL switches are installed on the side of the enclosure for setting the termination of the
RS485 interface in the safe area . If required, set it prior to installation on the mounting
rail as described in
. Termination to the gas flow meter is set fixed.
▸
Mount the FLPS Multibarrier on a 35 mm mounting rail (hat rail) according to EN
60715.
4.3
Electrical Installation
4.3.1
Cable specification
Cables and terminals
4.3.2
Connection parameters
Electrical isolation
▸
All connections to the safe area are isolated from the intrinsically safe connection and
ground.
▸
All intrinsically safe connections are not isolated from ground and must be connected to
the potential equalization (PE).
Input data for device supply
Parameters
Conductor cross section
0.5 … 2.5 mm² (20 … 12 AWG)
Cable type
Conform with the requirements in the appropriate installation area
Maximum cable length to the gas
flow meter (twisted pair)
200 … 500 m (depending on the conductor cross-section)
Insulation stripping
7 mm
Tightening torque
0.5 … 0.8 Nm
Ethernet cable type
Cat 5 or higher
Ethernet connector type
RJ45
Maximum cable length (Ethernet)
100 m
USB connection
Type mini USB 2.0
Parameters
Input/output/supply
Insulation voltage
500 V
eff
(1 min.)
Max. allowable voltage of the con-
nections in the safe area (rated
voltage)
30 V AC, 60 V DC
Connect the device only to equipment, which does not carry volt-
age higher than 30 V AC or 60 V DC peak. Use SELV power sup-
plies and equipment that meets the requirements of IEC/EN
60950 or IEC/EN 61010-1.
Symbol
Parameters
Min
Type
Max
Unit
V
in
Input voltage
10.8
24
26.4
V DC
I
in
Input current
400
mA
P
Power input
5
W