Commissioning and operation
FLOWSIC30 · Operating Instructions · 8020999/173B/V1-4/2020-02 · © SICK Engineering GmbH
47
Su
bj
ec
t t
o
ch
an
ge
w
ith
ou
t n
ot
ice
4.2
Commissioning via HART
®
4.2.1
Required tools and accessories
● Field Communicator with .dd file of the FLOWSIC30 (provided on the product CD)
4.2.2
Establish the connection to FLOWSIC30
In order to start the commissioning procedure via HART
®
, proceed as follows:
1
Connect the FLOWSIC30 to the HART
®
loop and power on the system.
2
Connect the 475 Field Communicator to the HART
®
loop according to the HART
®
operating specifications.
3
Start the HART
®
application module in the Field Communicator Main Menu to scan for
active devices. Found devices will be listed subsequently.
4
Select the device identified by “0: @@@@@@@@”. This tag indicates the FLOWSIC30
default factory configuration.
5
In case of a confirmation warning, press CONT to proceed.
Proper communication with the meter is indicated by a flashing heart on the display of
the Field Communicator above the display device main page.
The meter is now ready for commissioning.
4.2.3
Login procedure
In order to customize the meter configuration for commissioning purposes, you have to
login to the Field Communicator.
In the display device main page, proceed as follows to login:
1
“1 Device setup” > “3 Setup” > “1 Login” > Enter Default Password: 3333
The password can only be changed via modbus access.
2
Press ENTER.
The information “Login succeeded” indicates that the meter is now unlocked.
3
Press OK to continue.
The “Setup” menu now shows that the meter is unlocked: “3 Write protect No”
Due to pre-charge processes of internal energy storage capacitors, an initial
delay of approximately 1 minute can be expected when powering up the
FLOWSIC30. The device is running when the LC display starts operation.
After initial power up and power losses, the device is always write protected. To
unlock the device, you have to login first.