Chapter
5
Addendum Operating Instructions
C2000 Eco
30
© SICK AG • Industrial Safety Systems • Germany • All rights reserved
8011905/TI60/2010-02-12
Subject to change without notice
Electrical installation and
configuration
GB
5
Electrical installation and configuration
During the electrical installation of the C2000 Eco safety light curtain, observe the follow-
ing notes in addition to the information in the “C2000 Safety Light Curtain” operating
instructions:
To ensure full electromagnetic compatibility (EMC), functional earth (FE) must be
connected.
Pin no.
Colour
Designation
Meaning (I = input, O = output)
Sender
1
Brown
24 V DC
Voltage supply U
B
2
White
Test
I: device self-test
0 V = sender inactive
24 V = sender active
3
Blue
GND
0 V DC, voltage supply
4
Black
nc
Reserved
5
Grey
Shield
Functional earth
Receiver
1
Brown
24 V DC
Voltage supply U
B
2
White
OSSD 1
O: output signal switching device 1
3
Blue
GND
0 V DC, voltage supply
4
Black
OSSD 2
O: output signal switching device 2
5
Grey
Shield
Functional earth
5.1
Device configuration
The device configuration is described in the following chapters of the “C2000 Safety Light
Curtain” operating instructions:
chapter 5.4.1 Configuration of the device self test
chapter 5.4.2 Configuration of the cyclic system test
the functions
beam coding
EDM (external device monitoring)
RES (restart interlock)
are not available on the C2000 Eco safety light curtain.
Fig. 2: PIN assignment
M12 plug 5-pin
Tab. 1: Pin assignment
Sender
Receiver