background image

9

8

Viii - PrePArinG tHe cLADDinG

iX - cLADDinG

  Fasten the PSE template (d) on the access trap 

using two grey screws which can be found in the 

control panel box

  Fit the caps (f) and (g) on the supply bend (e) and 

on the drain pipe as well as the flexible sheaths 

(i) over the attaching rods of the toilet bowl (l)

  The thickness of the cladding must be between 20 and 100 mm (for 

the front) and 25 and 60 mm (for the top) and must be firmly attached 
to the building structure.

Cladding can be of various materials (brick, plaster blocks, plaster board, 

water repellent wood panels etc).

Cut the various holes (control panels and drain and supply of toilet bowl 

and toilet bowl attaching holes). There is a cutting template included on 

the back of the package.

d

f

g

Summary of Contents for VERSO BCM 800

Page 1: ...GB cistern FRAME VERSOBCM 800 ASSEMBLY AND MAINTENANCE MANUAL...

Page 2: ...2 DESCRIPTION a c d e h i j k m n o p q r l f g b...

Page 3: ...f valve Mechanism PSE template Supply bend Supply bend cap Toilet pipe cap Supply sleeve Bowl attaching kit Flexible sheaths x 2 Pipe attaching collar Toilet bowl attaching rods x 2 Setscrew x 2 Adjus...

Page 4: ...II Thickness of front cladding between 20 and 100 mm III Thickness of top cladding between 25 and 60 mm IV Height Adjustable from 800 to 1000 mm V Height of toilet bow 400 mm finished floor level VI...

Page 5: ...t the wall and attach it with the nuts first checking that the frame is vertically level Use a hacksaw to cut the threaded rods of the bracket protruding from the frame Position the frame in its final...

Page 6: ...ition the screw plugs in the holes Move the frame back in place and connect the drain pipe Attach the collar k Position the drain outlet pipe Tighten the collar k Before gluing the drain outlet pipe t...

Page 7: ...r supply tube in the cistern Connect your pipe to the shut off valve b either using the dual cone supplied or directly with the nuts provided on the water inlet in this case ensure tightness using a f...

Page 8: ...et bowl on the frame Turn on the water using the shut off valve b and wait until the toilet bowl fills Manually operate the mechanism c using the flush pull control Check the tightness of the supply a...

Page 9: ...ing rods of the toilet bowl l The thickness of the cladding must be between 20 and 100 mm for the front and 25 and 60 mm for the top and must be firmly attached to the building structure Cladding can...

Page 10: ...fit them to the frame Using a rule placed as shown in the drawing above make a mark on the wall side on the two sleeves For each of the sleeves measure the dimension L between the two marks Transfer t...

Page 11: ...at the part protruding from the wall measures B 20 mm Shorten the flexible sheaths j so that the part protruding from the wall measures B 15 mm l j B 20 mm Fitthesupplysleeve h andthedrain sleeve onto...

Page 12: ...XI ATTACHING THE TOILET BOWL When the toilet bowl is correctly positioned attach it using the kit i complying with the part stacking order i centering washer ii metal washer iii nut iv cover ii iii i...

Page 13: ...this purpose Put the control panel in place A Position the panel small button at the front on the frame spring left side B Pull over to the right C Place panel on cladding and release Break off the he...

Page 14: ...e right hand side C Remove panel Unscrew and remove frame Unscrew one of the plate screws Remove the plate and the spacer Close the shutoff valve b and separate it from the float valve a Turn the spac...

Page 15: ...the maintenance of the valve up to point then Grasp the mechanism by the base and remove it from the cistern Spare parts Seal P N 34 2332 07 Complete mechanism P N 32 4544 07 When maintenance is over...

Page 16: ...ries for the toilet SIAMP has taken every possible measure to apply all the necessary care to the design and production of this product offering a ten year guarantee except for rubber parts and manpow...

Reviews: