4
5
i - AsseMBLinG tHe tOiLet BOWL AttAcHinG rODs AnD WALL FiXinG
ii - ADJUstMent OF tHe FrAMe HeiGHt
➊
Measure the center distance of the toilet
bowl (A)
➋
Insert the rods (I) into the holes of the frame,
corresponding to the center distance
➌
Position the frame in place
➍
Secure the attaching tabs (q) to the rods (l),
position the assembly against the wall and
lock with the nuts.
➎
Position the wall mounting bracket (r) against
the wall and attach it with the nuts, first
checking that the frame is vertically level
➏
Use a hacksaw to cut the threaded rods of the
bracket protruding from the frame
➊
Position the frame in its final location
➋
Undo the 2 setscrews (m)
➌
Adjust the height of the feet so that the top of the toilet
bowl is at a height of 400 mm from the finished floor level.
➍
Check that the frame is level (vertically and horizontally) and
tighten the setscrews
If the frame is being attached to an unfinished floor surface,
the maximum thickness of the finished floor surface shall
not be more than 185 mm.
A
➊
A = 180 mm
A = 230 mm
➍
➎
➏
m