background image

OVE

INSTALLATION INSTRUCTIONS

VITREOUS CHINA WALL-HUNG LAVATORY

K-19950W/K-19951W

-1-

1062888-T01-A

106

2

324

200131

, 2006

Copyright Kohler China Ltd., 2006

·

·

·

Observe all local plumbing and building codes.
Prior to installation, unpack the new lavatory and inspect it
for damage. Return the lavatory to its protective carton
until you are ready to install it.
All information in these instructions are based the latest
product information available at the time of publication.
Kohler China reserves the right to make changes in
product characteristics, packaging, or availability at any
time without notice.

Make sure that the wall and floor are square

and plumb to ensure proper installation.

IMPORTANT:

·
·

·

ORDERING INFORMATION

OVE Vanity Top .................................................K-19950W

Includes Mounting Kits .....................................1034692

OVE Vanity Top .................................................K-19951W

Includes Mounting Kits .....................................1034692

........................................................K-19950W

........................................................1034692

........................................................K-19951W

........................................................1034692

REQUIRED MATERIALS/
(NOT SUPPLIED)

TOOLS

·
·

·
·
·

Level
Drill with

bit

6mm

14mm wrench
Framing square
Channel lock pliers
Tape measure

·

·
·
·
·
·
·

6mm

14mm

Summary of Contents for OVE K-19950W

Page 1: ...based the latest product information available at the time of publication Kohler China reserves the right to make changes in product characteristics packaging or availability at any time without notice Make sure that the wall and floor are square and plumb to ensure proper installation IMPORTANT ORDERING INFORMATION OVE Vanity Top K 19950W Includes Mounting Kits 1034692 OVE Vanity Top K 19951W Inc...

Page 2: ...nstallation and User Guide packed with the cabinet or stand for installation details Recommend Kohler metal square leg or Kohler bathroom furniture for support or decoration 1 2 3 4 5 1 Install the services 2 Make sure that the hot and cold water supply pipes and the waste are installed correctly 3 Mark the position on the wall for the attachment bolts Make sure that you avoid hidden cables and pi...

Page 3: ...gle Vanity Top Fig 3 3 Double Vanity Top 950mm Attachment Bolt x2 Wall Plug 550mm Waste Outlet Waste 630mm 820mm 80mm 6 Note The hot and cold water supplies must terminate with a supply shut off valve 6 Fit the tap to the basin in accordance with the manufacturer s instructions 1062888 T01 A ...

Page 4: ...ce the overflow cover over the overflow hole in the basin making sure it is orientated correctly Fig 5 5 1 2 3 4 Install the Plumbing 1 Install the drain in accordance with the manufacturer s instructions Make sure a watertight seal exists on all basin drain connections Provide access to the plumbing connections for future plumbing maintenance 2 Connect the hot and cold water supplies 3 Open the h...

Page 5: ...one year from date of purchase Kohler China will be responsible for any problems caused by manufacturing defects provided with the invoice Kohler China will at its election repair replace or make appropriate adjustment where Kohler China inspection discloses any such defects occurring in normal usage within one year after purchase Implied warranties including that of merchantability and fitness fo...

Reviews: