background image

Automatic well sounder “DUA-1” 

 

10 
 

2. INTENDED USE OF THE PRODUCT 

2.1. Operational limitations 

2.1.1 The following persons are allowed to work with the product: oil 

and  gas  production  operators  of  not  lower  than  the  fifth  category;  well 
research operators of not lower than the fourth category. Personnel must be 
trained to operate the product. Training is carried out by the employees of 
the manufacturer directly at the workplace. 

2.1.2 During the operation of the product use this operation manual, 

"Safety rules for exploration work", Federal norms and rules in the field of 
industrial safety "Safety rules in oil and gas industry", as well as approved 
by  the  head  of  the  company  instructions  for  maintenance  and  research  of 
wells,  taking  into  account  the  specifics  of  the  object  of  study  and 
technology of work. 

2.1.3  Preventive  maintenance  and  repair  of  the  product  shall  be 

performed  outside  the  explosion  hazard  zones.  Comply  with  fire  safety 
regulations, work in the open air or in  a well-ventilated room when using 
highly flammable liquids to clean the product. 

Observe  the  requirements  of  the  "Maintenance"  section  of  this 

document when operating the product. Do not allow severe contamination 
of  the  internal  parts  of  the  product,  especially  the  acoustic  sensor,  valve, 
and  taper  connection  threads,  resulting  in  poor  product  performance  and 
reduced service life. 

2.1.4  The  product  must  not  be  used  in  excess  of  the  operating 

conditions specified in this manual. 

2.1.5 Requirements to the object of investigation 
Well  arrangement  and  operation  shall  be  performed  in  accordance 

with the "Safety Regulations for Oil and Gas Industry". 

The  investigated  well,  regardless  of  its  purpose  and  method  of 

operation, shall have a technological branch with a gate valve and a branch 
pipe for connecting a volumetric device. Determination of the fluid level is 
possible  only  in  the  well  space  (tubular,  inter-tube,  annular,  bent),  which 
connects  to  the  technological  branch  used.  While  making  measurements, 
the  technological  branch  should  not  have  sharp  contractions  (fittings, 
pipettes and similar devices). Pipe branch should have a pipe cone thread 
60 in accordance with GOST 633 80, should be located at a height of 0.2 to 
1.8 m above the ground. If the height is more than 1.8 m, use stationary or 
portable  sites  provided  that  they  meet  the  requirements  of  the  “Safety 

Summary of Contents for DUA-1

Page 1: ...Tomsk Scientific Industrial Introduction Company SIAM LLC AUTOMATIC WELL SOUNDER DUA 1 OPERATING MANUAL Russia...

Page 2: ...Automatic well sounder DUA 1 2...

Page 3: ...6 Package 8 2 INTENDED USE OF THE PRODUCT 10 2 1 Operational limitations 10 2 2 Ensuring explosion proofness of the product 11 2 3 Measures to ensure and keep the device explosion proofness during th...

Page 4: ...temperature range from 40 C to 50 C The device design is comply with the assigned explosion proof mark with the requirements of GOST IEC 60079 14 2013 and other regulatory documents governing the use...

Page 5: ...IIA IIB categories and T1 T2 T3 groups can form according to GOST R IEC 60079 20 1 2011 in the operating temperature range from 40 C to 50 C The device design is comply with the assigned explosion pr...

Page 6: ...the level control m max 1 Pressure measurement range kgf m2 from 0 to 150 Resolution capacity of pressure control kgf sm2 max 0 1 Maximum magnetic valve actuation pressure kgf m2 max 50 non volatile m...

Page 7: ...ittings and does not require measuring cables The product performs acoustic pulse generation in annular space reception transformation and analysis of acoustic response echo signal fluid level determi...

Page 8: ...on the product body and contains trade mark or the name of the manufacturing company name of the product the serial number of the product according to the numbering system of the manufacturing compan...

Page 9: ...stacked inside the transport container manufactured according to the drawings of the manufacturer 1 6 2 A packing list containing the following information is enclosed in the transport container name...

Page 10: ...e requirements of the Maintenance section of this document when operating the product Do not allow severe contamination of the internal parts of the product especially the acoustic sensor valve and ta...

Page 11: ...h the requirements of GOST 31610 11 2014 IEC 60079 11 2011 including leakages and clearances The minimum width of conductors on the PCB is 0 2 mm copper thickness is not less than 18 m Thus the electr...

Page 12: ...ked against the short circuit current limit Materials used for casting the protective component Fib are subjected to an acceptance test according to the certificates presented 2 3 2 Measures to ensure...

Page 13: ...red only by the employees of the manufacturer Repair by third parties or individuals is prohibited the protective component Fib is not to be repaired It is made intact and must be replaced in case of...

Page 14: ...6 2 5 2 Fluid level control To control the level the product should be installed on the measuring pipe branch of the wellhead valve Turn on the power to the product Start the DB SIAM program on your n...

Page 15: ...utomatic removal of the recovery curve or level drop set the type of investigation LRC level recovery curve or LDC level drop curve Set the acoustic pulse generation by solenoid valve Set the period o...

Page 16: ...e period of inclusion 180 minutes the number of measurements 7 With the enabled resolution of the transition from the LRC LDC in the mode of automatic pressure recording if the fluid level falls below...

Page 17: ...t the examination type DYN or STAT 2 5 6 Battery charge Do not charge the battery at temperatures below 0C To charge the battery connect the mains adapter to the 220 V 50 Hz network or the car adapter...

Page 18: ...s malfunction is displayed at the factory when the product is put into operation for the first time 2 ferromagnetic memory malfunction 3 analog to digital converter malfunction 4 no response from the...

Page 19: ...ek Operating personnel Maintenance of the exhaust valve see p 3 3 every month Operating personnel Cleaning of accumulator charging socket see p 3 4 every month Operating personnel Performance monitori...

Page 20: ...lication of metal tools an awl a screwdriver etc is allowed but do not apply an excessive force not to damage the thread It is strictly forbidden to use a metal tool for cleaning the acoustic and pres...

Page 21: ...e installing it back in the well sounder apply a small amount of lubricant according to standard CIATIM GOST 6267 80 on the rubber sealing ring surface 5 After mounting the valve on the well sounder i...

Page 22: ...of the acoustic path 4 heck the Automatic pressure recording mode 5 heck of the maximum working pressure not more than 100 atm 6 heck in the mode Battery capacity control The methods of monitoring are...

Page 23: ...n place After a final assembly of the well sounder it is necessary to carry out the integrity and strength tests First install the well sounder on the Inspection bench SKU 1 IZM 4 137 003 and test for...

Page 24: ...at 35 C Storage rooms should be free from dust acid and alkali vapors corrosive gases and other harmful impurities causing corrosion Battery should be stored separately To ensure long storage of the...

Page 25: ...ic well sounder DUA 1 25 REVISION RECORD SHEET Revi sion Numbers of sheets pages Total sheets pages of document Ref of docu ment Incoming of supporting document Signa ture Date Revised Replaced New An...

Reviews: