All Rights Reserved
Shyam Telecom Limited Page
29/34
Next Generation
Signal Enhancement
d)
Gain settings in DL & UL
12. Feedback regarding performance of the system must be obtained from
the user.
8.8. Checklist – Post Installation
Before the system is configured for normal traffic, points as indicated in the
checklist may be verified for trouble free performance.
Service Band:
Frequency Band (DL):
Frequency Band (UL):
A. Repeater Installation
S.NO. Point(s) To be Verified
Remarks
1.
Ensure isolation between server and donor
antennas, it has to be 15 dB + Gain set of the
repeater.
2.
Actual isolation measured
3.
Ensure proper grounding of the unit
4.
Cable from donor antenna connected to donor
antenna port
5.
Cable from server antenna connected to the
relevant port in the unit
6.
Mains cable connected to the repeater unit
7.
Cable protection ensured and outdoor
connections are waterproof
B. Repeater Set Up
S.NO. Point(s) To be Verified
Remarks
1.
Number of sub bands equipped
2.
Sub band(s)- Bandwidth set
3.
Repeater switched ON
4.
Any error (alarms) observed
5. Gain
set
6.
Power level in DL
7. Attenuation
in
DL
8.
Power level in UL
9. Attenuation
in
UL
10.
Observation on CMC software & GUI
11.
Repeater Secured & locked
Any Other Remark/Comment:
Date Of Installation: ------------------------ Repeater ID: -------------------------------
Site Address: --------------------------------------------------------------
Name of the Installer: -----------------------------------------------------