Page
All Rights Reserved Shyam Telecom Limited
35/43
Next Generation
Signal Enhancement
8.7. Checklist – Post Installation
After completion of installation, points as stated in the checklist may be verified
to ensure that all aspects have been covered.
Service Bands Particulars:
Frequency Band for Band 1 DL
Frequency Band for Band 1 UL
Frequency Band for Band 2 DL
Frequency Band for Band 2 UL
A. Repeater Installation
S.NO.
Point(s) To be Verified
Remarks
1.
Ensure isolation between server and donor
antennas, it has to be 15 dB + Gain set of the
repeater.
2. Actual
isolation
measured
3.
Ensure proper grounding of the unit
4.
Cable from donor antenna connected to donor
antenna port
5.
Cable from server antenna connected to the
relevant port in the unit
6.
Mains cable connected to the repeater unit
7.
Cable protection ensured and outdoor connections
are waterproof
B. Repeater Set Up
S.NO.
Point(s) To be Verified
Remarks
1.
Number of sub bands equipped
2.
Number of Sub band(s) in Band 1 with frequency
bandwidth of each.
3.
Number of Sub band(s) in Band 2 with frequency
bandwidth of each.
4.
Repeater switched ON
5.
Any error (alarms) observed
6. Gain
set
7.
Power level in DL
8.
Attenuation in DL
9.
Power level in UL
10.
Attenuation in UL
11.
Observation on CMC software & GUI