19
SHOWTEX INSTALLATION MANUAL
RAIL H100 ROPE CONTROLLED
3: Bring the carriers to the centre position of the rail or stage. Make sure the two
rope ends come back together at the point between the (overlap) carrier and the
first runner.
4: Attach the 2nd rope clamp to the operating line next to the first connection.
Only use the lower bolt this time and tighten firmly to prevent the rope from
slipping away.
5: Attach the upper thread of the clamp with the (overlap) carrier and use the
upper bolt to secure the rope. Tighten the bolt firmly to prevent the rope from
slipping away.
6: Now attach the returning rope to the other (overlap) carrier following the same
procedure as shown in the fourth and fifth step of this chapter.
Summary of Contents for Rail H100
Page 1: ......
Page 2: ...2 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED ...
Page 10: ...10 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Page 12: ...12 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Page 22: ...22 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED Have a great show ...