13
SHOWTEX INSTALLATION MANUAL
RAIL H100 ROPE CONTROLLED
INSTALLATION
This chapter provides all required information and steps necessary for installing a manually rope-controlled Rail H100 system.
Note that a certain technical knowledge and experience are required to understand this guide and install this product.
BE S
NECESSARY STEPS
1.
Determine attachment points & distance between them.
2.
Place brackets on rail(s), secure them by hand.
3.
Place coupler on outer end of each rail, secure them by hand.
4.
Mount first rail in supporting structure & secure brackets to rail.
5.
Mount second rail in supporting structure & secure coupler.
6.
Repeat step 5 for all other pieces of rail.
7.
Insert first end stop (optional for single track installation).
8.
9.
Insert runners and master or overlap carriers.
10.
end stop (optional for single track installation).
11.
12.
Add weighted return or floor-fixed pulley.
Insert double braided rope accordingly.
14.
15.
Connect rope to master or overlap carriers using the rope clamps.
16.
Test system without curtain & check curtain width.
17.
18.
Connect curtain ends to head/return pulley. (optional)
When installing a rail between 2 walls,
rail in the supporting structure!
NECESSARY TOOLS
The following tools are needed to install the H100 rope controlled rail track
Wrench 10
Wrench 13
Wrench 17
Wrench 8
Allen key n° 3
Summary of Contents for Rail H100
Page 1: ......
Page 2: ...2 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED ...
Page 10: ...10 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Page 12: ...12 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Page 22: ...22 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED Have a great show ...