Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
www.shorestation.com
0004405
Page 4 of 12
Rev B 11/05/2013
Mount the lower frame weldment to the winch post
extrusion, making sure that the leg pin aligning hole is
to the top side of the hoist,
using two (2) 3/8” X 5-
3/16” X 3-7/8” square u-bolts. Slide the u-bolts thru
the notches on the bottom of the winch post extrusion,
the holes in the weldment and s
ecure with 3/8” flange
lock nuts.
Mount the guide post tube to the opposite end of the
lower frame weldment using a leg adjustment pin and
making sure the slot in the guide post is to the inside
of the lift. Secure with a hitch pin clip. Also mount the
guide post tube to the lower frame tube using two (2)
3/8” X 3-7/8” X 3-7/8” RUB’s. Secure with 3/8” flange
lock nuts.
Slide the platform assembly into the winch post
extrusion as shown. Make sure that the side of the
assembly with the pulley goes in first.
Align the other end to slide down over the guide
post.
Hook the end of the cable into the slot on the guide
post.
Note; Be sure that the cable end is in the guide
post tube and the cable is in the notch.