background image

Instructions continued overleaf

3 Place ring handle

‘C5’ on the outside
of the door. Place
the handle approx.
half way up the
door making sure
you are central to the framework running
across the other side. Mark the holes.
Join the holes with a marker to find the
centre. Then drill centre point only. (6mm
Drill Bit). Place the wooden handle on the
inside of the door and screw from the
outside; using the hole just drilled. Fix the
‘C5’ ring handle,
using 4x 25mm
black screws, on
the other side of
the door covering
the screw head.

4 Place the three false hinges in position

on the front of the door, ensure the
screws go through the framework on the
back of the door.  Screw into position
using  4x 25mm black screws per hinge.

2 The double window (BB) panel must go

at either side of the front.  Decide where
you would like the window panels.  Place
2 wall panels (D) in position in a back
corner.  Drill guide holes in one panel
only.  Screw to the other panel using 2x
60 mm screws in each panel.  Repeat.

5 Fit the door to the panel using 25 mm

screws in 10 of the available holes
spaced evenly along the length.

F

Prepare Floor

1 Place a bar in one plain side panel (D).

Measure from the bottom of top piece of
framework of the panel to the top of the
bar 740 mm.  Drill the edge of the panel
and screw the bar into place using 1x 60
mm screw at either end.  This panel
MUST be fitted opposite the double
window panel.

G

Fit Walls

1 Place the upstairs floor (A1) on top of the

bottom window and the bar previously
fixed to a plain side panel.

6 Place the balustrade railing in front of the

upstairs floor, flush to the front wall.
Note: slats face the upstairs.  Drill and
screw into position using 3x 60 mm
screws along the bottom of the
balustrade into the upstairs floor.

2 Attach the floor in position using 2x 60

mm screws at each side, up through
each bar and into the floor.

5 Using the predrilled holes in the gables,

fit four roof (H2) bearers using 8x 80 mm
screws. One in each end.

I

Upstairs

Attach the two

half gables (E & F)

together.  Drill and screw fix using

2x 60 mm screws.  Repeat.

On the side that is

angled, drill holes above each

upright in each gable section. Drill from
the back to front. Four in each gable
section. See pic.

3 Secure the gable sections using the pre-

drilled holes. Screw through the wall into
gable. 4x 60mm screws. Repeat.

H

Fit Gables

1 Place floors on your firm level base,

board side up. Take 5 pieces framework
34x46 floor joiners and place between
each floor joist.  Nail half of the widest
part to the floor using 3x 40 mm nails per
piece.

2 Once this is done repeat on the opposite

side of this floor. This now becomes the
middle part of the floor.

3 Once all frameworks are fitted between

floor joists slide another floor on top of
the framework and secure again using
3x 40 mm nails per floor joist. (Repeat
for other floor section).

4 Place vents

into the
aperture in
gable
panels.

3 Fix the upstairs floor to the framework of

the two side walls using 2x 80 mm
screws.

4 Place the balustrade railing against the

side of the upstairs floor and against the
gable wall.  Mark on both sides of the
balustrade railing where the railing (A3)
meets the bottom edge of the gable
framework.  Connect the two marks and
cut the balustrade railing.

7 Attach to the front wall using 2x 60 mm

screws.

8 Attach the ladder (A4) to the upstairs

floor using 2x 60 mm screws.

9 Attach the framework of the balustrade

railing to the roof bearer using 1x 60 mm
screw, placed at an angle.

1

2

Reviews: