background image

Model No.

EDA86

Owner's Manual & Assembly Instructions

      XP01

2,4 m x 1,7 m    247,7 cm x 174,6 cm          253,4 cm    181,0 cm      201,0 cm           240,7 cm     167,6 cm     197,8 cm    110,5 cm   175,9 cm

                                           Exterior Dimensions                     Interior Dimensions                    Door

       *Approx.                Base                   (Roof Edge to Roof Edge)                      (Wall to Wall)                       Opening
           Size                    Size                  Width       Depth       Height           Width       Depth      Height       Width     Height

          8' x 6'          97 1/2" x 68 3/4"          99 3/4"     71 1/4"      79 1/8"           94 3/4"        66"         77 7/8"       43 1/2"    69 1/4"

715990111

  Storage Area:     43 Sq. Ft.

271 Cu. Ft.

                   4,0 m

2

           7,7 m

3

BUILDING DIMENSIONS  

* Size rounded off to the nearest foot

CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.

Summary of Contents for EDA86

Page 1: ...h Depth Height Width Depth Height Width Height 8 x 6 97 1 2 x 68 3 4 99 3 4 71 1 4 79 1 8 94 3 4 66 77 7 8 43 1 2 69 1 4 715990111 Storage Area 43 Sq Ft 271 Cu Ft 4 0 m2 7 7 m3 BUILDING DIMENSIONS Siz...

Page 2: ...luded with your building Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all th...

Page 3: ...ork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and...

Page 4: ...er concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite...

Page 5: ...Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check...

Page 6: ...re plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 2 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support...

Page 7: ...choring XA07 AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Page 8: ...ight 2 left 67468 Peak Cap 2 Arrow Logo 66045 Handle 2 66646 Washer 176 5 sheets of 40 65004 8Ax5 16 8mm Screw 282 65923 8 32x3 8 10mm Bolt 93 65900A 10Bx1 2 13mm BlackScrew 8 PackedwithScrews 65103 8...

Page 9: ...le 2 10 8946 Side Floor Frame 2 11 5288 Corner Post 4 12 9342 Side Wall Angle 2 13 5287 Splice Post 1 14 7311 Door Jamb 2 15 9344 Siding Stud 6 16 8719 Side Siding 6 17 6658 Gable Brace 2 18 9345 Rear...

Page 10: ...10 Assembly by Key No XP10...

Page 11: ...rear floor frames as shown The holes in these pieces will align when the pieces are posi tioned with correct amount of over lap See the illustrations below for the proper overall length of the rear f...

Page 12: ...e rear wall Pro ceed as follows 1Overlaptherightandleftrearwall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 2 Set the assembly aside You will use it l...

Page 13: ...oin the two gables andsupporttheroofpanels Themain roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws 2...

Page 14: ...zed pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later st...

Page 15: ...front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood plat...

Page 16: ...ly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged...

Page 17: ...jambs to the door track with two screws Do the same for the bottom into frame There must be a 7 8 2 2 cm gap between end of ramp and edge of door jamb Notched edge faces to ward center of building Fas...

Page 18: ...corner posts at the sides Position stud inside top angle and fasten with a screw at the lower hole 2 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure fo...

Page 19: ...siding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts using screws 5Repeatsteps1through4foroppo site side of building N...

Page 20: ...post and door jamb This siding is fastened from the inside using screws into post and jamb 4 Install front siding to complete both front sections 9345 Rear Siding 6 9746 Front Siding 6 Parts Needed Fo...

Page 21: ...ece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Step 11...

Page 22: ...est to center gable leg 2 Join the left and right gables together with a gable brace using a bolt in the bottom two holes only 3 Repeat Steps 1 2 for the door track on the front of building except for...

Page 23: ...e other end of the main roof beam to the gable brace of the rear gable 3 Fasten the remaining roof beams small holes on top as shown using bolts Main Roof Beam 1 8474 Roof Beam 2 Parts Needed For Roof...

Page 24: ...oles will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2...

Page 25: ...sten roofpaneloverlapsnotusedforridge cap roof center Cover the head of bolt with the 2 5 1 cm piece of weather stripping tape NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjacent...

Page 26: ...ide Roof Trim Peak Cap 5 STEP STEP 3 8482 6 3 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap 4 Using your thumb and index...

Page 27: ...rtical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Pu...

Page 28: ...e door slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 13mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repe...

Page 29: ...id nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by th...

Reviews: