
2. UNPACKING & INSTALLATION
2-1. Unpacking
Unpack the container carefully. Examine the packaging and the device for any
damage, and report it to the shipper if there is any. Try to keep the scale
upright.
Check for enclosures as follows:
①
Scale main
uni
t
②
Weighing pan with pan base
③
AC Adapt
e
r
④
Operation manual
Note : 1. If any items are missing or any damage is discovered immediately notify
your place of purchase or a dealer.
2. Keep box and shock absorber pad after installation. They are required for
transportation.
2-2. Installing the Weighing Pan
Place the pan base packed with the weighing pan on the scale. Fix it by driving
the nut on the pan base to the screw in the center of the scale. Place the
weighing
pan properly on the pan base.
* The receiving element of the pan base is directly linked with the delicate weighing
mechanism. A tension or a side force may damage the unit.
2-3 To Level the Scale
The scale must be level for proper operation. Use the 4 level adjusters located at
the 4 corners of the scale main unit to adjust the horizontal position of the scale
until the bubble of the bubble level lies within the red circle. Ensure that the
scale sits solidly and does not wobble due to uneven adjustment.
2