63(64)
6.1 Maintenance Schedule
6.1.1 General Information of the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.1.2 Installation & Inspection
Check if the air pipe are tightly connected.
Check if the material clearance door tightly closed.
Check if the air pipes are correctly connected.
Electrical Installation
Voltage V Hz
Fuse melt current
:
1 Phase A 3 Phases A
Check phase sequence of the power supply.
Check rotating direction of regenerating motor.
6.1.3 Daily Checking
Check the switch of the machine.
Check auto start-up of the machine.
Check the temperature controller.
Clean the filter.
Check whether overheat protection is normal.
Check whether dew-point is normal.
Check whether cooling water circulation and Y-type fitter are normal
1
.
6.1.4 Weekly Checking
Check all the electric wires.
Check loose electric connections.
Check and clean compressed air filter and regulator.
Check magnetic valve.
Check motor overload relay and phase-reversed prevention function.
Check whether air pipe is shed, leaked and loose.
6.1.5 Monthly Checking
Check if the belt is loose or not.
Summary of Contents for SMD-1000H
Page 1: ...SMD H Series Mould Sweat Dehumidifier Date Sep 2014 Version Ver B English...
Page 2: ......
Page 11: ...11 64 1 3 2 Outline Drawing SMD 500H 1000H SMD 1500H 2000H Picture 1 1 Outline Drawing...
Page 15: ...15 64 1 6 Maintenance Schedule Picture 1 3 Maintenance Schedule...
Page 25: ...25 64 2 4 2 Main Circuit SMD 500H 1500H Picture 2 6 Main Circuit 1 SMD 500H 1500H...
Page 26: ...26 64 Picture 2 7 Main Circuit 2 SMD 500H 1500H...
Page 27: ...27 64 2 4 3 Control Circuit SMD 500H 1500H Picture 2 8 Control Circuit SMD 500H 1500H...
Page 33: ...33 64 2 4 7 Main Circuit SMD 2000H Picture 2 11 Main Circuit 1 SMD 2000H...
Page 34: ...34 64 Picture 2 12 Main Circuit 2 SMD 2000H...
Page 35: ...35 64 2 4 8 Control Circuit SMD 2000H Picture 2 13 Control Circuit SMD 2000H...