![Shini SHD-100-EB Manual Download Page 20](http://html1.mh-extra.com/html/shini/shd-100-eb/shd-100-eb_manual_1258058020.webp)
20(27)
3.4.2 Suction Box Installation
Picture 3-4: European Suction Box
When installing the SHD-EB on the floor stand, the suction box SBU is required,so
conveyor can take away the dried plastics. The installation of European suction
box and shut-off suction box is simple, which are mounted at the hopper bottom,
and it must lock corresponding holes with screws.
Picture 3-5: Shut-off Suction Box
Summary of Contents for SHD-100-EB
Page 1: ...SHD EB Budget Hopper Dryer Date Nov 2020 Version Ver C...
Page 2: ......