![Shini SHD-100-EB Manual Download Page 18](http://html1.mh-extra.com/html/shini/shd-100-eb/shd-100-eb_manual_1258058018.webp)
18(27)
3.2 Connecting the Power Source
Open the control box and connect the power source in accordance with wiring
diagram. Notice should be taken concerning if the power voltage is in compliance
with the required specifications, also if the switch and load are proper and safe.
Notes: Before connecting, the main switch and heat switch should be off.
3.3 The Hopper Dryer Test
After ensuring all the circuits have been connected firmly, turn on the blower
switch to
”
ON
”
status and turn on the heater switch on control box to
“
ON
”
status.
Then light indicator of the switch would turn on, observe whether the rotating
derection of the blower is same as the arrow indicated direction. If it is not,
randomly exchange two of the three power firing lines and connect them firmly.
Picture 3-2: Blower
Summary of Contents for SHD-100-EB
Page 1: ...SHD EB Budget Hopper Dryer Date Nov 2020 Version Ver C...
Page 2: ......