![Shini SHD-100-EB Manual Download Page 17](http://html1.mh-extra.com/html/shini/shd-100-eb/shd-100-eb_manual_1258058017.webp)
17(27)
3. Installation and Debugging
Notes for Installation and Positioning
:
1) Machine just can be mounted in vertical position. Make sure there
’
s no pipe,
fixed structure or other objects above the installing location and around the
machine which may block machine
’
s installation, hit objects or injure
human person.
2) In order to maintain convenient operation, it
’
s suggested to keep 1m space
around the machine. Please keep at least 2m distance between the device
and the inflammable goods.
3) This series of models only could be applied in working environment with
good ventilation.
3.1 Direct Installation
Picture 3-1: Direct Installation
Direct installation type is to mount the hopper dryer directly on the molding
machine via a standard base.
When using the method to mount the dryer, the equipped standard base must
according to material inlet diameter of the molding machine mounting drill holes.
Then use the screw to fasten the base and the molding machine inlet.
Summary of Contents for SHD-100-EB
Page 1: ...SHD EB Budget Hopper Dryer Date Nov 2020 Version Ver C...
Page 2: ......